7 Servicing/Maintenance
51 of 132
Amacan P
7.2 Maintenance/inspection
KSB recommends the following regular maintenance schedule:
Table 9:
Overview of maintenance work
Maintenance interval
Servicing/maintenance work
For details see ...
Every 4000 hours, at least once a
year
Measuring the insulation resistance
(
ð
Section 7.2.1.1, Page 51)
Every 8000 hours, at least every
3 years
Checking the cable bundle
(
ð
Section 7.3.3, Page 54)
Checking the earth conductor
(
ð
Section 7.3.4, Page 55)
Checking the sensors
(
ð
Section 7.2.1.2, Page 51)
Checking the mechanical seal leakage
(
ð
Section 7.3.5, Page 55)
Changing the lubricant
(
ð
Section 7.4.1, Page 56)
Every 16,000 hours, at least
every 5 years
Lubricating the rolling element bearings
(
ð
Section 7.4.2, Page 59)
General overhaul
On pump sets with sacrificial anodes, the sacrificial anodes must initially be checked
after 6 months. If necessary, the sacrificial anodes must be replaced. If the sacrificial
anodes show little wear, the maintenance interval can be extended to 12 months.
7.2.1 Inspection work
7.2.1.1 Measuring the insulation resistance
Measure the insulation resistance of the motor winding during annual maintenance
work.
ü
The pump set has been disconnected in the control cabinet.
ü
Use an insulation resistance measuring device.
ü
The recommended measuring voltage equals 500 V (maximum permissible
1000 V).
1. Measure the winding to chassis ground.
To do so, connect all winding ends together.
2. Measure the winding temperature sensors to chassis ground.
To do so, connect all core ends of the winding temperature sensors together
and connect all winding ends to chassis ground.
ð
The insulation resistance of the core ends to chassis ground must not be lower
than 1 MΩ.
If the resistance measured is lower, power cable and motor resistance must be
measured separately. Disconnect the power cable from the motor for this
purpose.
NOTE
If the insulation resistance of the power cable is lower than 1 MΩ, the power cable
is defective and must be replaced.
NOTE
If the insulation resistances measured on the motor are too low, the winding
insulation is defective. The pump set must not be returned to service in this case.
7.2.1.2 Checking the sensors
CAUTION
Excessive test voltage
Damage to the sensors!
▷
Use a commercially available ohmmeter to measure the resistance.
Содержание Amacan P 1000-700
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 1580 87 08 EN 01137299...