5 Installation at Site
30 of 132
Amacan P
Fig. 15:
Lowering the pump set
18. Finally, attach the support rope with shackle and turnbuckle to a suspension
loop (provided in the discharge tube or structure). Secure the turnbuckle with a
split pin. After inserting the split pin, bend over its two legs.
19. Tighten the turnbuckle until the cable bundle is tight without lifting the pump
off its seat.
20. Unclip the hook of the lifting equipment from the lifting lug, free the electric
cables from the manila rope and route them to the control cabinet.
21. Make sure that the top loose lifting lug is attached to the cable bundle to
prevent noise and wear caused by chafing.
22. Remove the safety cover from the discharge tube and mount the discharge tube
cover. Seal the cable entries if any!
5.3.4 Installation with a support rope and support spacer
Always refer to and comply with the general arrangement drawing / outline drawing
when installing the pump set.
Prior to installing the pump set, visually inspect the support rope. Do not exceed the
permissible load-carrying capacity.
X
59-24
X
59-17.01
Fig. 16:
X = indication of load-carrying capacity
59-24
Support rope
59-17.01
Shackle
Содержание Amacan P 1000-700
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 1580 87 08 EN 01137299...