
VII - 19
Maintenance
7.14 Care after daily use
After daily operation, the area of the conveyor and
cutter unit as well as the area next to it must be
cleaned and regularly treated with preservatives.
7.15 Maintenance and repair work
inside the load space
Before performing any maintenance or repair work inside
the load space, it is essential to lock the opened rear
gate against lowering. Use appropriate means for safe
access.
7.13.4 Compressed air receiver
The compressed air receiver stores the compressed air
supplied by the compressor. During operation, therefore,
condensation water may collect in the receiver.
The compressed air filter must be regularly emptied:
– every day during winter (when used),
– otherwise, every week but
– at least after 20 operating hours.
The receiver is drained via the drainage valve on the
underside.
• Shut down the loading wagon and secure.
• Open the drain valve and release the condensation
water.
• Check the drain valve, clean it and screw it back in.
A heavily contaminated or leaky drain
valve must be replaced by a new one.
Содержание 5XL-R/GL
Страница 4: ...Foreword ...
Страница 8: ...4 Contents ...
Страница 12: ...I 4 Generalinformation ...
Страница 17: ...II 5 Safety ...
Страница 24: ...II 12 Safety ...
Страница 42: ...III 18 Operation KDW03210 1 Arrest the short cut loading wagon by applying the parking brake 1 ...
Страница 48: ...IV 6 Control Unit 4 5 Manual mode 4 5 1 Basic screen Loading operation ZX000008_1 ...
Страница 84: ...IV 42 Control Unit ...
Страница 92: ...IV 50 ISO operation ...
Страница 104: ...VI 10 Hydraulic system ...
Страница 124: ...VII 20 Maintenance ...
Страница 126: ...VIII 2 Overwintering ...
Страница 128: ...IX 2 Recommissioning ...
Страница 130: ...X 2 Faults causes and removal ...
Страница 152: ...A 22 Appendix ...
Страница 153: ...A 23 Appendix ...