background image

KOZI

 

D

IRECT 

V

ENT 

G

AS 

S

TOVE

 

 

 

 

 

TABLE OF CONTENTS 

 

 
General Information 

 

Customer 

Greeting 

         

 

Overall 

Unit 

Dimensions 

        

 

 

Safety Certification Information

  

 

 

 

 

 

 

  4 

 

Typical Venting Configuration

   

 

 

 

 

 

 

  5 

 

Installation Instructions

   

 

 

 

 

 

 

 

  6 

 

General 

Information 

         

 

Locating Your 

KOZI

 

Gas 

Stove 

      

  

 

 

Clearances 

to 

Combustible 

Surfaces 

      

 

Combustion 

And 

Ventilation 

Air 

       

 

 

Venting 

 

 

 

 

 

 

 

 

 

  9 

 Installation 

Precautions 

       10 

 

Venting Configurations – Horizontal Termination 

 

 

 

12 

 Venting 

Configurations 

– 

Vertical 

Termination 

    13 

 Examples 

of 

Venting 

Configurations 

     13 

 Planning 

Your 

Installation 

       14 

 

Simpson Dura-Vent Direct Vent Parts Listing 

 

 

 

 

15 

 

Vent Restrictors 

 

 

 

 

 

 

 

 

16 

 Horizontal 

Termination 

Installations 

     16 

 Vertical 

Termination 

Installations 

      18 

 Cathedral 

Ceiling 

Installations 

      20 

 Connecting 

The 

Gas 

Supply 

      21 

 Log 

Installation 

And 

Placement 

      22 

 Door 

Installation 

And 

Latch 

Adjustment 

     23 

 

Adjusting The Primary Air For Combustion 

 

 

 

 

24 

 

Operating Instructions 

 

 

 

 

 

 

 

 

25 

 

 Lighting 

Procedure 

        25 

 Shutdown 

Instructions 

       26 

 

Maintenance And Service Instructions

 

 

 

 

 

 

27 

 

 General 

Venting 

Maintenance 

      28 

 Log 

Replacement 

        29 

 

Gold Plated Trim 

 

 

 

 

 

 

 

 

29 

 Door 

Gasket 

Replacement 

       29 

 Glass 

Replacement 

        29 

 Glass 

Door 

Replacement 

       30 

 Electrical 

Schematic        30 

 Fuel 

Conversion 

        31 

 General 

Layout 

        33 

 

KOZI

 DV1

 

Parts 

Listing 

       33 

 Warranty 

Information        35 

 

 

 

 

Содержание DV1-FS series

Страница 1: ...o Do not try to light any appliance o Do not touch any electrical switch do not use any phone in your building o Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s in...

Страница 2: ...e installation and proper operation instructions may be found within the following pages Check all local building and fire codes before installing your new appliance When a qualified installer service...

Страница 3: ...r Installation 14 Simpson Dura Vent Direct Vent Parts Listing 15 Vent Restrictors 16 Horizontal Termination Installations 16 Vertical Termination Installations 18 Cathedral Ceiling Installations 20 Co...

Страница 4: ...label The safety label is located on the inside surface of the right side door Note Due to constant development KOZI units and technologies are consistently being upgraded Please ensure that the labe...

Страница 5: ...ior to the installation of your new KOZI Direct Vent Freestanding Gas Stove In the event of absent or damaged components contact your KOZI dealer Note The following list only covers the minimum parts...

Страница 6: ...Venting System Should Be Inspected Annually By Qualified Personnel The Stove Area Must Also Be Kept Clean Of Flammable Materials Vapors And Liquids Under No Circumstances Should This Unit Be Modified...

Страница 7: ...ounded in accordance with local codes or in the absence of local codes with the National Electrical Code ANSI NFPA 70 or the Canadian Electrical Code CSA C22 1 This appliance is equipped with a three...

Страница 8: ...shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than psi kPa Installation and repair should be done by a qualified service person The appl...

Страница 9: ...sland Installation F Dividing Room G Two Elbow Venting Figure 3 Various Approved Installation Configurations CLEARANCES TO COMBUSTIBLE SURFACES The list of clearances provided are MINIMUM distances on...

Страница 10: ...VENTING The instructions contained within the pages of this manual pertain to the installation of Simpson Dura Vent Direct Vent System model DV GS This venting system in combination with the KOZI Dir...

Страница 11: ...as instructed in this manual or by Simpson Dura Vent IMPORTANT Carefully Read All Instructions To Completion Prior To Installation Failure To Follow These Instructions May Result In Safety Hazards As...

Страница 12: ...KOZI DIRECT VENT GAS STOVE 12 Figure 5 Vent terminal minimum clearance requirements...

Страница 13: ...ion of allowable horizontal venting configurations Example A 10 foot vertical rise with a 10 foot horizontal run falls within the shaded area and therefore is an allowable installation Additionally ve...

Страница 14: ...ation A 10 foot vertical rise falls within the shaded area and therefore is an allowable venting configuration Venting with an offset to vertical termination A 15 foot vertical rise with a 4 foot hori...

Страница 15: ...ing the ceiling thickness the vertical rise in the attic or second story and an allowance to satisfy clearance requirements above the roofline If the application calls for a two story through the floo...

Страница 16: ...Length Black Finish 907B 9 Pipe Length Black Finish 906 12 Pipe Length Galvanized 906B 12 Pipe Length Black Finish 904 24 Pipe Length Galvanized 904B 24 Pipe Length Black Finish 903 36 Pipe Length Ga...

Страница 17: ...ing path Adjust the unit accordingly 2 Simpson Dura Vent Direct Vent pipe and fittings are designed with special twist lock connections for attaching the appliance flue outlet to the venting system Th...

Страница 18: ...rminal slide the decorative wall thimble cover over the pipe and attach with wood screws 6 Slide the appliance and vent assembly towards the wall carefully inserting the vent pipe into the vent cap as...

Страница 19: ...of the venting You may wish to offset the venting or relocate the appliance to accommodate these clearances 3 To install the Round Support Box Wall Thimble in a flat ceiling cut a 10 inch square hole...

Страница 20: ...r similar factors In these cases increasing the vent height may resolve the problem Twist lock the vent terminal NOTE If an offset is necessary in the attic to avoid obstructions it is important to su...

Страница 21: ...the support box through the hole in the roof until the bottom of the box protrudes at least two inches below the ceiling Align the support box both horizontally and vertically with a level Temporarily...

Страница 22: ...al regulator and should be checked before firing at the pressure test point provided Supply pressure should also be checked prior to firing These test points are the two 1 8 NPT plugged tapping locate...

Страница 23: ...of the stove Centre the log to the burner When properly positioned the knot should be located on the top left corner of the log Refer to Figures 9 10 for further details Figure 9 Side view of burner...

Страница 24: ...ould be unlocked and removed is during regular maintenance and servicing Always have the side doors fully open when removing or installing the glass door this will prevent any unnecessary scratching o...

Страница 25: ...ish flame base All of the burner ports should be burning and none of the flames should be lifting off the burner once stabilized The flame pattern should be dancing quite consistently not slow or lazy...

Страница 26: ...t and insure that the burner switch is in the OFF position before proceeding any further 2 Check the position of the control knob If it is found in the OFF position proceed to step 4 3 Rotate control...

Страница 27: ...ting the unit SHUTDOWN INSTRUCTIONS 1 Open the control compartment door 2 Turn the burner switch to the OFF position 3 If a complete shutdown is required or desired turn the control knob to the OFF po...

Страница 28: ...annually When the logs are being cleaned use a very soft paintbrush as the logs are fragile and can be easily damaged Clean the glass doors only when the unit is cold never clean when hot Wipe glass g...

Страница 29: ...obstructed 3 Check for evidence of excessive condensation such as water droplets forming in the inner liner and subsequently dripping out of the joints Continuous condensation can cause severe corrosi...

Страница 30: ...use 3 4 fiber glass braided rope gasketing only see parts list for appropriate part numbers and or kit numbers GLASS REPLACEMENT This KOZI DV1 Direct Vent Gas Stove has been tested and certified with...

Страница 31: ...e proper condition Replace if necessary 3 Reinstall the door onto the unit and check that the door gasket properly seals the door Adjustment of the door latches may be required to achieve a proper sea...

Страница 32: ...ab to the proper position as shown in Figure 13 3 Replace Pilot Hood and tighten securely 4 Test for gas leakage at all pilot connections 14 20 NATURAL GAS 14 20 PROPANE Figure 13 Quick Change Pilot A...

Страница 33: ...manifold tube aligns closely to the orifice Loosening of the orifice support might be required be sure to tighten again before use 7 Test all applicable connections for gas leakage prior to replacing...

Страница 34: ...el DV1 104 Trim Molding DV1 105 KOZI Logo 2 DV1 2 Burner Body Assembly 3 DV1 3 Control Door Assembly DV1 301 Door Handle 4 DV1 4 Hearth 5 DV1 5 Door Support 6 DV1 6 Glass Door Assembly DV1 601 Door Fr...

Страница 35: ...ion Gate Assembly DV1 2003 Explosion Gate Gasket 21 DV1 21 Explosion Gate Bracket 22 DV1 22 Mounting Plate Assembly DV1 2202 Gas Valve Mounting Bracket DV1 2203 Gas Orifice Mounting Bracket DV1 2204 P...

Страница 36: ...in accordance with the applicable rating plate Discoloration and expansion movement of certain parts is normal and will not be covered under warranty Gas Valve and Electrical Components Gas and electr...

Отзывы: