MAINTENANCE PROCEDURES
MAINTENANCE
4-28
SHOE FIXING SCREWS CHECK AND TIGHTENING
4
WARNING
q
To compensate for the inevitable settling movements,
it is indispensable to check the tightening torque of
the screws (1) after the first 30 hours of operation.
Carry out another check after the first 100 hours of
running-in and, if the screws have become loose
again, repeat the check after 200 hours of operation.
q
If the screws (1) become loose and are not tightened at
the required torque, the useful life of the tracks will be
shorter.
q
After tightening, make sure that the nut and the track
are in contact with the surface of the link.
The check must be carried out with the machine parked on
level ground.
How to tighten the steel tracks
Tighten the screws with an initial torque of 196±19.6 Nm (20±2
kgm), making sure that the nut and the track are in contact with
the surface of the link. Then give an additional turn of 90° ±
10°.
How to tighten the road liners
Tighten the screws with a torque of 196±19.6 Nm (20±2 kgm),
making sure that the nut and the track are in contact with the
surface of the link. Then give an additional turn of 60° ± 10°.
Tightening sequence
The screw tightening sequence for each element must be 1-2-
3-4, as shown in the figure.
After tightening, make sure that the nut and the track are in
contact with the surface of the link.
WEAM014802
Содержание PC118MR-8
Страница 1: ......
Страница 2: ......
Страница 3: ...FOREWORD 11 WEAM014802...
Страница 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Страница 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Страница 40: ...SAFETY LABELS SAFETY 2 16 For detail see LIFTING CAPACITIES TABLES 3 168 q Overload alarm WEAM014802...
Страница 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Страница 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Страница 379: ...SPECIFICATIONS 15 WEAM014802...
Страница 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Страница 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Страница 417: ......
Страница 418: ......