INTRODUCTION
FOREWORD
1-12
RUNNING-IN
1
All machines have been meticulously adjusted and tested before delivery.
However, a new machine must be used with caution during the first 100 hours, for a correct running in of the
different components.
If the machine is subjected to excessive work load at the beginning of operation, its potential productivity and its
functionality will be shortly and untimely reduced. For more details, see "Running-in (3-136)".
WEAM014802
Содержание PC118MR-8
Страница 1: ......
Страница 2: ......
Страница 3: ...FOREWORD 11 WEAM014802...
Страница 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Страница 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Страница 40: ...SAFETY LABELS SAFETY 2 16 For detail see LIFTING CAPACITIES TABLES 3 168 q Overload alarm WEAM014802...
Страница 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Страница 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Страница 379: ...SPECIFICATIONS 15 WEAM014802...
Страница 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Страница 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Страница 417: ......
Страница 418: ......