MAINTENANCE
MAINTENANCE PLAN
4-21
MAINTENANCE PLAN
4
If the machine is equipped with hydraulic breaker, the maintenance schedule for some components will be
different. For further details, see "MAINTENANCE INTERVALS IN CASE OF USE OF THE HYDRAULIC
BREAKER (4-23)".
MAINTENANCE PLAN
4
MAINTENANCE EVERY 100 HOURS OF OPERATION
MAINTENANCE EVERY 250 HOURS OF OPERATION
MAINTENANCE EVERY 500 HOURS OF OPERATION
CLEANING AND INSPECTION OF THE RADIATOR FINS, OIL COOLER, FINAL COOLER, FUEL AND AIR CONDITIONER
CONDENSER COOLER .................................................................................................................................................................. 4-64
MAINTENANCE EVERY 1000 HOURS OF OPERATION
WEAM014802
Содержание PC118MR-8
Страница 1: ......
Страница 2: ......
Страница 3: ...FOREWORD 11 WEAM014802...
Страница 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Страница 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Страница 40: ...SAFETY LABELS SAFETY 2 16 For detail see LIFTING CAPACITIES TABLES 3 168 q Overload alarm WEAM014802...
Страница 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Страница 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Страница 379: ...SPECIFICATIONS 15 WEAM014802...
Страница 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Страница 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Страница 417: ......
Страница 418: ......