PAD-L
Basic Operation
3-3
15. Turn the VOLTAGE setting knob fully counterclockwise.
16. Turn the CURRENT setting knob fully clockwise.
17. Turn off the POWER switch.
This concludes the operating conditions inspection.
SAMPLING
+
–
+
+
–
–
GND
GND
GND
+S
—S
+S
—S
PAD250-15L only
TYPE III, IV, V models (Except the following models)
PAD110-60L only
OUTPUT
Shorting bar
Shorting bar
Shorting bar
Shorting bar
Shorting bar
In this Operation Manual,
the SAMPLING (red and white),
+S, and -S terminals
are referred to as sensing terminals.
Fig. 3-1
Output terminals
(Shorting bars connection at factory shipment)
C
0
1
2
3
4
5
6
7
8
9
10
C
0
123
45
6
7
8
9
10
AC
TYPE III models
TYPE IV models and TYPE V models
Shorting bar
Shorting bar
Fig. 3-2
Control terminal board
(Shorting bars connection at factory shipment)
Содержание PAD-L III Series
Страница 4: ...II PAD L...
Страница 16: ...P 6 Preface PAD L...
Страница 17: ...1 1 PAD L Setup 1 1 Chapter 1 Setup Describes the necessary procedure from unpacking to preparation before use...
Страница 40: ...2 12 Precautions and Preparations for Use PAD L...
Страница 86: ...4 34 Applied Operation PAD L...
Страница 93: ...PAD L Names and Functions of Controls 5 7 22 25 23 26 24 21 Fig 5 6 PAD L series PAD250 15L rear panel...
Страница 95: ...PAD L Names and Functions of Controls 5 9 22 26 23 25 21 24 28 29 Fig 5 8 PAD L series PAD110 60L rear panel...
Страница 98: ...5 12 Names and Functions of Controls PAD L...
Страница 130: ...7 14 Specifications PAD L...