4-24
Applied Operation
PAD-L
Connecting and setting procedure for parallel operation (continued)
8.
Connect an electrolytic capacitor (C) with a capacity of 100 to 100,000
µ
F to the load terminals as necessary.
If the length of wiring to a load extends to 3 m or more, the phase shift caused by
the inductance and capacitance of the wiring becomes non-negligible, thereby
causing oscillation. In such cases, the capacitor (C) prevents oscillation.
CAUTION
•
Use a capacitor (C) whose withstand voltage is 120% or more of
the unit's rated output voltage.
9.
Recheck that the connections.
WARNING
•
After connections are complete, install the terminal cover.
C
0
1
2
–
GND
+
3
4
5
6
7
8
9
10
Remove shorting bars
Control terminals
Output terminals
C
0
1
2
–
GND
+
3
4
5
6
7
8
9
10
C
0
1
2
–
GND
+
3
4
5
6
7
8
9
10
Load
Master
unit
Slave
unit 1
Slave
unit 2
L1
L2
L3
L1 = L2 = L3
For the master unit only, connect
the - or + terminal to the GND
terminal using a shorting bar.
Fig. 4-16
Connection for master-slave-control parallel operation
Содержание PAD-L III Series
Страница 4: ...II PAD L...
Страница 16: ...P 6 Preface PAD L...
Страница 17: ...1 1 PAD L Setup 1 1 Chapter 1 Setup Describes the necessary procedure from unpacking to preparation before use...
Страница 40: ...2 12 Precautions and Preparations for Use PAD L...
Страница 86: ...4 34 Applied Operation PAD L...
Страница 93: ...PAD L Names and Functions of Controls 5 7 22 25 23 26 24 21 Fig 5 6 PAD L series PAD250 15L rear panel...
Страница 95: ...PAD L Names and Functions of Controls 5 9 22 26 23 25 21 24 28 29 Fig 5 8 PAD L series PAD110 60L rear panel...
Страница 98: ...5 12 Names and Functions of Controls PAD L...
Страница 130: ...7 14 Specifications PAD L...