KC-P30
Commissioning
Installation manual V3.28
46
© KEBA
Information
The tripping characteristics of the internal DC residual current monitoring is
based on the product-specific standard IEC 62955. According to this stan-
dard, a trigger delay of up to 10 seconds is permitted. This circumstance
may result in a negative evaluation for conventional test settings for type B
residual current circuit breakers. Here, special test settings are to be used
for EVSE (Electric Vehicle Supply Equipment).
9.3
Mount covers
In order to operate the charging station correctly, all covers must be inserted
and screwed tight. If necessary, a seal can be attached.
Caution
For correct installation of devices with a calibratable energy meter, the
charge point operator must apply a seal.
For devices with MID certification, at least the terminal cover must be se-
cured using a seal.
For devices with national certification, the connection panel cover must be
secured using a seal.
To mount all covers, proceed as follows:
1) Insert terminal cover and tighten with 2 screws.
If necessary, the right upper screw can be provided with the supplied
sealing cap (see
).
2) Insert connection panel cover and tighten with four screws to 2 Nm. The
tabs on the connection panel cover must be flush with the enclosing
housing. Only then will the device be properly sealed.
If necessary, the right upper screw can be provided with the supplied
sealing cap (see
).