KC-P30
Description of the charging station
Installation manual V3.28
17
© KEBA
Product designation (example)
KC-P30-
E
S
2
4
00
2
1
-
0
0
0
-xx
Shutter
S
13 A
1
16 A
2
20 A
3
32 A
4
Cable type
x
No cable
00
4 m cable
01
6 m cable
04
5.5 m cable
07
Device series
x
e-series
0
b-series
1
c-series
2
x-series WLAN
B
x-series WLAN, 3G
C
x-series WLAN, 4G
E
x-series 3G
G
x-series 4G
H
Switching element
x
Contactor 1-phase
1
Contactor 3-phase
2
Energy meter
x
None
0
Energy meter, not calibrated
E
Calibratable energy meter, MID
1)
M
Calibratable measuring instrument for electrical
energy
2)
with national certification
L
Authorization
x
None
0
RFID
R
Key-operated switch
K
1)
MID (Measuring Instruments Directive): Measuring Instruments Directive
2)
In accordance with Section 46 of the German Measures and Verification Act (Rule Determination Committee
(REA) No. 6.8)
Variants with energy meter
The energy meter measures only the energy that is actually output. The en-
ergy for the charging station's internal power supply is not recorded by the
energy meter.