KC-P30
Connections and wiring
Installation manual V3.28
31
© KEBA
●
Make sure that the connection cables are inserted centered, straight and
without pressure through the double-membrane seals to ensure seal
tightness.
●
The installation pipe or cable conduit with the feed line may not be
screwed together in the cable gland (above) or run through the double-
membrane seals (behind).
●
The supply line must be routed straight through the cable gland resp. the
double-membrane seals in compliance with the bending radii (approx.
cable diameter times 10).
●
For surface-mounted cable installation, the cable gland must be installed
properly and screwed together sufficiently tight.
7.3.2
Connecting the voltage supply
The charging station can be connected in the following ways:
1-phase: via terminals
L1, N and
PE
3-phase: via terminals
L1, L2, L3, N and
PE
The supply terminals are designed as spring-type terminals. The handling in-
structions enclosed in the terminal area must be observed.
Caution
Risk of breaking the terminal!
Do not press the screwdriver up, down or to the side!
To connect the supply voltage, proceed as follows:
1) Shorten the connection wires to the appropriate length (as short as pos-
sible). The protective conductor
PE
must be longer than the other
conductors!