Technical features
BR/BD 100/250 R BP / RI
Page 18 / 171
Service Manual 08.2007
2.5 Water system
1
Metering valve (Y2)
2
Connecting plug (X99) square, metering
valve (Y2)
Connecting plug (X99) square, metering
valve (Y2)
Connecting plug (X99) of the metering valve (Y2)
1
2
Pin 1
Battery voltage 24 volt (+).
Pin 2
24 volt if water pump ON.
0 volt if water pump OFF.
Pin 3
Earth 0 volt.
Pin 4
Control voltage for servo motor:
1.7-1.9 volt = metering valve maxi-
mum open.
3.1-3.3 volt = metering valve minimum
open
0 volt = metering valve closed.
Pin 1
Pin 2
Pin 3
Pin 4
Содержание BD 100 R
Страница 1: ...Service Manual 08 2007 5 906 252 0 BR BD 100 250 R RI BR BD 120 250 R RI 1 480 Service Manual ...
Страница 2: ...BR BD 100 250 R BP RI Page 2 171 Service Manual 08 2007 ...
Страница 153: ...BR BD 100 250 R BP RI Circuit diagrams Page 153 171 Service Manual 08 2007 8 1 Circuit diagram 0 088 734 0 Head CPU A1 ...
Страница 154: ...Circuit diagrams BR BD 100 250 R BP RI Page 154 171 Service Manual 08 2007 8 2 Circuit diagram 0 088 876 0 Head CPU A1 ...