6-1
6 MAINTENANCE
The main purpose of daily and weekly mainte-
nance is general monitoring over state of units and sys-
tems to ensure safe driving as well as maintaining proper
external appearance.
Daily maintenance is performed once a day prior
to departure or in stations after prolonged work.
Weekly maintenance is performed once a week
by a driver. It is tolerable to perform weekly mainte-
nance in a service center by demand of vehicel owner.
Attention!
Be sure to address the service center if any faults
discovered during daily and weekly mnt.
During maintenance, avoid ingress of greases
into sewerage, surface water, ground water or soil.
Greases are used in accord with suggestions of
Appendices 2, 3.
Содержание 5490
Страница 1: ...KAMAZ PUBLICLY TRADED COMPANY Operation manual Z 5490 vehicle 5490 3902203 01 Naberezhnye Chelny 2017...
Страница 185: ...10 1 10 MANUFACTURER S WARRANTY The guarantee terms are agreed upon in a pur chase sale agreement...
Страница 206: ...8 Figure 1 Pre heater electric circuit...
Страница 207: ...9 Figure 2 Pre heater main components...
Страница 208: ...10 Figure 3 Pre heater basic components...
Страница 220: ...4 Fig 2 The main parts of the liquid heater PRAMOTRONIC 16WD 24...
Страница 226: ...10 Fig 6 The diagram of the assembly of the fuel system of the heater with an individual fuel tank...
Страница 229: ...13 Fig 9 The diagram of the fuel pump assembly...
Страница 234: ...1 APPENDIX SERVICE INSTRUCTION AIRTRONIC D2 INDEPENDENT DEVICE FOR HEATING AND MAINTENANCE OF AIR TEMPERATURE IN THE CAB...
Страница 249: ...Operating Instructions Trucks ZF NewEcosplit...
Страница 289: ......
Страница 291: ......
Страница 293: ......