Kaleidescape Part No. 101-0105-00 Rev 5
Page 47
Kaleidescape Premiere Line Installation Guide
Physical Installation
3. Check that all lights are blue before closing the front panel.
4. Leave the server connected to the Internet for at least one hour.
5. After waiting an hour, power off the server, then restart. This power
off/on sequence installs the most recent software and activates
licensing.
The server can be powered on/off by pressing the
POWER
button, or can
be rebooted remotely from the browser interface. See
.
M500 Player
1. Plug the power cord into the socket labeled
AC-IN
on the back of the
player. Plug the other end of the cable into a grounded outlet with a high-
quality surge protector.
Do NOT operate the server with empty slots. Empty slots
compromise the cooling system. Fill any empty slots with
blank disk cartridges.
3U Server with front
panel down
1U+ Movie Server
with front panel off