Recommissioning
The truck may only be recommissioned after cleaning or repair work, once the
following operations have been performed.
– Test horn.
– Test EMERGENCY DISCONNECT switch.
– Test brake.
6
Decommissioning the industrial truck
If the industrial truck is to be decommissioned for more than one month, e.g. for
operational reasons, it must be parked in a frost-free and dry location and all
necessary measures must be taken before, during and after decommissioning as
described.
M
On decommissioning the truck must be jacked up so that all the wheels are clear of
the ground. This is the only way of ensuring that the wheels are not damaged.
If the truck is to be out of service for more than 6 months, further measures must be
taken in consultation with the manufacturer’s service department.
6.1
Prior to decommissioning:
– Thoroughly clean the truck.
– Check the brakes.
– Check the hydraulic oil level and replenish as necessary (see Chapter F).
– Apply a thin layer of oil or grease to any non-painted mechanical components.
– Lubricate the truck in accordance with the lubrication schedule (see Chapter F).
– Charge the battery (see Chapter D).
– Disconnect the battery, clean it and apply grease to the terminals.
Z
In addition, follow the battery manufacturer’s instructions.
– Spay all exposed electrical contacts with a suitable contact spray.
F 17
0
708
.GB
5.10
Recommissioning
The truck may only be recommissioned after cleaning or repair work, once the
following operations have been performed.
– Test horn.
– Test EMERGENCY DISCONNECT switch.
– Test brake.
6
Decommissioning the industrial truck
If the industrial truck is to be decommissioned for more than one month, e.g. for
operational reasons, it must be parked in a frost-free and dry location and all
necessary measures must be taken before, during and after decommissioning as
described.
M
On decommissioning the truck must be jacked up so that all the wheels are clear of
the ground. This is the only way of ensuring that the wheels are not damaged.
If the truck is to be out of service for more than 6 months, further measures must be
taken in consultation with the manufacturer’s service department.
6.1
Prior to decommissioning:
– Thoroughly clean the truck.
– Check the brakes.
– Check the hydraulic oil level and replenish as necessary (see Chapter F).
– Apply a thin layer of oil or grease to any non-painted mechanical components.
– Lubricate the truck in accordance with the lubrication schedule (see Chapter F).
– Charge the battery (see Chapter D).
– Disconnect the battery, clean it and apply grease to the terminals.
Z
In addition, follow the battery manufacturer’s instructions.
– Spay all exposed electrical contacts with a suitable contact spray.
Содержание EKS 410
Страница 1: ...EKS 513 515 EKS 410 Operating instructions 52025221 EKS 410 513 515k 515 G 12 03 07 08...
Страница 3: ...0108 GB...
Страница 7: ...0708 GB I 4...
Страница 9: ...0506 GB 2...
Страница 11: ...1004 GB A 2...
Страница 16: ...B 5 0708 GB Ast Wa h15 h10 h3 h9 h7 h6 h1 h4 b2 l1 l2 m2 R b5 l...
Страница 23: ...0708 GB B 12...
Страница 35: ...1004 GB D 6 21 23 22 25 24 19 18 20 20 24 22...
Страница 37: ...1004 GB D 8...
Страница 67: ...0206 GB E 30...
Страница 87: ...0708 GB F 20...