System Reset
1. Turn the circuit breakers ON.
2. Press and hold
CANCEL
and at the same time close the control
enclosure cover to activate the safety switch and turn the unit on.
3. Continue to hold
CANCEL
until the machine beeps.
4. Fully engage the enclosure cover screws and lock finger tight.
Set System Parameters
Verify Voltages
1. Measure AC voltages for chamber and door heaters, control
enclosure, LFPS, vaporizer, and compressor. Refer to chart for
version main line voltage and nominal voltages expected ±10% for
each circuit.
Main Line Voltage Version
200 VAC
208 VAC
380 VAC
398 VAC
415 VAC
Feature Measure
Input
Voltage At
208V-60 380V-50 380V-50 380V-50
LFPS CB7
A-B 200 220 220 220 220
Chamber
Heaters
CB6
A-B 200 208 220 220 220
Door Heaters
CB4 A-B
200
208
220
220
220
Control
Enclosure
CB3
A-B 120 120 120 120 120
Vaporizer
J-89 pin 7, 8
25
25
25
25
25
Compressor
Utility
J-83B
120 120 120 110 120
Pin 7
Pin 8
J-89
Содержание ASP STERRAD 100S
Страница 1: ...STERRAD 100S Sterilizer Installation Guide ...
Страница 5: ...STERRAD 100S Installation Guide 5 Chapter 1 Installation Overview ...
Страница 14: ......
Страница 15: ...STERRAD 100S Installation Guide 15 Chapter 2 For Your Safety ...
Страница 20: ......
Страница 21: ...STERRAD 100S Installation Guide 21 Chapter 3 Installation ...
Страница 23: ...Chapter 3 Installation STERRAD 100S Installation Guide 23 Figure 1 Installation Diagram ...