Chapter 3. Installation
STERRAD
®
100S Installation Guide
42
4. Press
OPEN DOOR
to change the MM, DD, and YY each in turn
until the desired setting is displayed. Press
CLOSE DOOR
each
time to move the cursor to the next field. After the YY is updated,
the following message is displayed on the LCD:
TIME=HH:MM:SS AM
OPEN(change) - CLOSE (accept)
HH is the hour of the day, e.g., 09; MM is the minutes, e.g., 12; SS is the
seconds, e.g., 43; AM represents after midnight and PM represents after
noontime.
5. Press
OPEN DOOR
to change the HH, MM, and SS each in turn
until the desired setting is displayed. Press
CLOSE DOOR
each
time to move the cursor to the next field. After the AM/PM is
updated, the current date is displayed.
6. After the desired date and time settings have been obtained,
simultaneously press
START
and
CANCEL
to exit the month/time
program and continue to the PM Log Rest.
PM Log Reset
1. Press
OPEN DOOR
and
START
to enter the edit mode. The system
displays the total machine cycles. Press
CANCEL
to display the PM
warning. Press
CANCEL
again to display PM 1500 L1. The display
looks like the following example:
P.M. Y: NEXT PM 1500 L1
OPEN (reset) -
CANCEL
(next)
Note: The cursor flashes on the N/Y field. The NEXT
PM field displays the total remaining cycles
before the system stops running cycles.
2. Press
OPEN
DOOR
to change the N default to Y (indicating
maintenance has been completed). Verify that the NEXT PM field
resets to the total allowable cycles (1500) between maintenance
intervals.
3. Press
CANCEL
(display moves to date), then press
START
and
CANCEL
at the same time. The system display returns to the ready
state and prints the Maintenance Log.
Содержание ASP STERRAD 100S
Страница 1: ...STERRAD 100S Sterilizer Installation Guide ...
Страница 5: ...STERRAD 100S Installation Guide 5 Chapter 1 Installation Overview ...
Страница 14: ......
Страница 15: ...STERRAD 100S Installation Guide 15 Chapter 2 For Your Safety ...
Страница 20: ......
Страница 21: ...STERRAD 100S Installation Guide 21 Chapter 3 Installation ...
Страница 23: ...Chapter 3 Installation STERRAD 100S Installation Guide 23 Figure 1 Installation Diagram ...