SECTION 4 - BOOM & PLATFORM
3121234
4-29
4.
Install retract wire ropes into rear end of fly section,
route wire ropes through holes in side of fly boom sec-
tion and pull into slot.
5.
Install side, top and bottom wear pads to the rear end of
mid section; shim evenly to the measurements of the
inside of mid section.
WHEN ASSEMBLING BOOM SECTIONS, ENSURE THAT THE BOOM SLIDING TRA-
JECTORIES HAVE BEEN CLEARED OF CHAINS, TOOLS, AND OTHER OBSTRUC-
TIONS.
6.
Shim the insides of the boom sections for a total of
1/16 in. (1.6 mm) clearance (if the action is centered,
there will be 1/32 clearance on each side).
7.
Slide fly boom section into the mid boom section. Shim
boom, if necessary, for a total of 1/16 in. (1.6 mm) clear-
ance.
8.
Install wear pads into the forward position of the mid
boom section. Shim boom, if necessary, for a total of
2/10 in. (5 mm) clearance.
9.
Properly position the retraction wire rope sheaves
assemblies at the rear end of the mid boom section;
ensure all sheave-to-mounting block attachment holes
align. Install the sheave pins and secure them with
mounting hardware. Position retract wire ropes onto the
sheaves.
10.
Install sheave guards to rear end of mid boom section
and secure with mounting hardware.
11.
Slide mid boom section into the base boom section.
Allow the retraction wire ropes to trail between the bot-
tom surfaces of boom sections. Shim boom, if necessary,
for a total of 1/16 in. (1.6 mm) clearance.
12.
Install wear pads into the forward position of the base
boom section. Shim boom, if necessary, for a total of
2/10 in. (5 mm) clearance.
13.
Install sheave block to bottom of base boom section
and adjust block so that retract wire ropes do not come
into contact with boom surfaces.
14.
Install wire rope threaded ends through attachment
holes in the bottom of base boom section. Loosely
install nuts and jam nuts onto the threaded ends of wire
ropes.
15.
Pull the boom sections out to approximately where they
were extended to for telescope cylinder removal.
16.
Install a new extend sheave on the end of the telescope
cylinder.
17.
Route new extend cables around the telescope cylinder.
Loosely fasten the threaded end of the cables to the rod
end of the telescope cylinder with the adjusting nuts
and lock nuts. Install the opposite end of the cables in
the cable mount block.
18.
Use tape or tie straps to fasten the cables to the tele-
scope cylinder assembly. It is important that the tape or
straps be strong enough to hold the cable in place yet
weak enough to break and fall away when the cables are
adjusted.
WHEN PUSHING THE TELESCOPE CYLINDER INTO THE BOOM, IT MAY BE NEC-
ESSARY AT SOME POINT TO TURN THE CYLINDER SLIGHTLY IN ORDER TO
CLEAR ASSEMBLIES MOUNTED WITHIN THE BOOM. CARE MUST BE TAKEN TO
MOVE THE CYLINDER SLOWLY INTO THE BOOM. DAMAGE TO COMPONENTS
MAY RESULT FROM FORCIBLE IMPACT WITH THESE ASSEMBLIES.
Figure 4-15. Routing Installation of Retract Wire Ropes
Содержание 680S
Страница 1: ...Service and Maintenance Manual Model 680S Prior to SN 0300189341 P N 3121234 December 05 2017 AS NZS...
Страница 2: ......
Страница 48: ...SECTION 2 GENERAL 2 10 3121234 Figure 2 1 Engine Operating Temperature Specifications Deutz 4150548 E...
Страница 49: ...SECTION 2 GENERAL 3121234 2 11 Figure 2 2 Engine Operating Temperature Specifications Ford 4150548 E...
Страница 50: ...SECTION 2 GENERAL 2 12 3121234 Figure 2 3 Engine Operating Temperature Specifications Caterpillar 4150548 E...
Страница 51: ...SECTION 2 GENERAL 3121234 2 13 Figure 2 4 Engine Operating Temperature Specifications GM 4150548 E...
Страница 52: ...SECTION 2 GENERAL 2 14 3121234 NOTES...
Страница 55: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 3 This page left blank intentionally...
Страница 86: ...SECTION 3 CHASSIS TURNTABLE 3 34 3121234 Figure 3 25 Assembly Tools Bearing Cone Pressing B Bearing...
Страница 87: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 35 Figure 3 26 Assembly Tools Bearing Cone Pressing A Bearing...
Страница 88: ...SECTION 3 CHASSIS TURNTABLE 3 36 3121234 Figure 3 27 Assembly Tools Bearing Cup Pressing A B Bearings...
Страница 89: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 37 Figure 3 28 Assembly Tools Seal Pressing...
Страница 90: ...SECTION 3 CHASSIS TURNTABLE 3 38 3121234 Figure 3 29 Assembly Tools Spacer Brake Disc Installation...
Страница 91: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 39 Figure 3 30 Assembly Tools Brake Retaining Ring Installation...
Страница 139: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 87 Figure 3 62 Swing Hub Prior to SN 0300134352...
Страница 143: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 91 Figure 3 64 Swing Brake...
Страница 196: ...SECTION 3 CHASSIS TURNTABLE 3 144 3121234 Figure 3 82 Rotary Coupling Port Location Prior to SN 0300137913 5 1660303 B...
Страница 205: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 153 This page left blank intentionally...
Страница 206: ...SECTION 3 CHASSIS TURNTABLE 3 154 3121234 Figure 3 89 Generator Troubleshooting Circuit Diagram Sheet 1 of 2...
Страница 207: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 155 Figure 3 90 Generator Troubleshooting Circuit Diagram Sheet 2 of 2...
Страница 208: ...SECTION 3 CHASSIS TURNTABLE 3 156 3121234 Figure 3 91 Generator Electrical Circuit Diagram...
Страница 209: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 157 Figure 3 92 Power Board PC1 Electrical Circuit Diagram...
Страница 210: ...SECTION 3 CHASSIS TURNTABLE 3 158 3121234 Figure 3 93 Power Board PC2 Electrical Circuit Diagram Sheet 1 of 2...
Страница 211: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 159 Figure 3 94 Power Board PC2 Electrical Circuit Diagram Sheet 2 of 2...
Страница 224: ...SECTION 3 CHASSIS TURNTABLE 3 172 3121234 Figure 3 103 EMR 2 Engine Side Equipment...
Страница 225: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 173 Figure 3 104 Deutz EMR 2 Troubleshooting Flow Chart...
Страница 226: ...SECTION 3 CHASSIS TURNTABLE 3 174 3121234 Figure 3 105 Deutz EMR 2 Vehicle Side Connection Diagram...
Страница 227: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 175 Figure 3 106 Deutz EMR 2 Engine Side Connection Diagram Sheet 1 of 2...
Страница 228: ...SECTION 3 CHASSIS TURNTABLE 3 176 3121234 Figure 3 107 Deutz EMR 2 Engine Side Connection Diagram Sheet 2 of 2...
Страница 229: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 177 Figure 3 108 EMR 2 Engine Plug Pin Identification...
Страница 230: ...SECTION 3 CHASSIS TURNTABLE 3 178 3121234 Figure 3 109 EMR 2 Vehicle Plug Pin Identification...
Страница 231: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 179 Figure 3 110 EMR2 Fault Codes Sheet 1 of 5...
Страница 232: ...SECTION 3 CHASSIS TURNTABLE 3 180 3121234 Figure 3 111 EMR2 Fault Codes Sheet 2 of 5...
Страница 233: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 181 Figure 3 112 EMR2 Fault Codes Sheet 3 of 5...
Страница 234: ...SECTION 3 CHASSIS TURNTABLE 3 182 3121234 Figure 3 113 EMR2 Fault Codes Sheet 4 of 5...
Страница 235: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 183 Figure 3 114 EMR2 Fault Codes Sheet 5 of 5...
Страница 264: ...SECTION 3 CHASSIS TURNTABLE 3 212 3121234 NOTES...
Страница 285: ...SECTION 4 BOOM PLATFORM 3121234 4 21 This page left blank intentionally...
Страница 286: ...SECTION 4 BOOM PLATFORM 4 22 3121234 Figure 4 7 Boom Assembly Cutaway Sheet 1 of 2 10 15 12 6 9...
Страница 333: ...SECTION 4 BOOM PLATFORM 3121234 4 69 Figure 4 25 Load Sensing Device...
Страница 336: ...SECTION 4 BOOM PLATFORM 4 72 3121234 NOTES...
Страница 402: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 66 3121234 Figure 5 100 Fault logic Troubleshooting...
Страница 403: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 3121234 5 67 Figure 5 101 Fault logic Troubleshooting...
Страница 404: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 68 3121234 Figure 5 102 Fault logic Troubleshooting...
Страница 407: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 3121234 5 71 This page left blank intentionally...
Страница 410: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 74 3121234 Figure 5 105 Hydraulic Schematic Sheet 3 of 8 SHEET 2...
Страница 412: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 76 3121234 Figure 5 107 Hydraulic Schematic Sheet 5 of 8 SHEET 3...
Страница 414: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 78 3121234 Figure 5 109 Hydraulic Schematic Sheet 7 of 8 SHEET 4...
Страница 416: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 80 3121234 NOTES...
Страница 423: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 7 Figure 6 2 ADE Block Diagram...
Страница 445: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 29 Figure 6 6 Analyzer Flow Chart Prior to Version 5 X Software Sheet 4 of 4...
Страница 447: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 31 Figure 6 8 Analyzer Flow Chart Version 5 X Software Sheet 2 of 4...
Страница 461: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 45 1 1001103667 Y Figure 6 22 Ground Control Module Sheet 1 of 3...
Страница 462: ...SECTION 6 JLG CONTROL SYSTEM 6 46 3121234 1 1001103667 Y Figure 6 23 Ground Control Module Sheet 2 of 3...
Страница 463: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 47 1 1001103667 Y Figure 6 24 Ground Control Module Sheet 3 of 3...
Страница 464: ...SECTION 6 JLG CONTROL SYSTEM 6 48 3121234 CONNECTOR 1001141138 D Figure 6 25 Platform Control Module Sheet 1 of 2...
Страница 465: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 49 CONNECTOR 1001141138 D Figure 6 26 Platform Control Module Sheet 2 of 2...
Страница 480: ...SECTION 6 JLG CONTROL SYSTEM 6 64 3121234 NOTES...
Страница 491: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121234 7 11 Figure 7 15 Connector Installation...
Страница 526: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 46 3121234 Figure 7 54 Electrical Schematic GM Sheet 1 of 2 SHEET 1...
Страница 528: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 48 3121234 NOTES...
Страница 529: ......