1 - 5
Direct Glazing (cont'd)
Preparing the New Glass (cont'd)
5
Install the Ultra Fast Adhesive cartridge (see
Sealing
and Retaining Compounds
, Section 1 and
Note 2
below) into a suitable applicator gun:
a
Remove the aluminium disc cover from the base of
the cartridge and discard the 'dessicant capsule'.
b
Make sure that the rolled edge of the cartridge is not
damaged - if necessary, the edges should be
pressed flat, otherwise it will be difficult to remove
the cartridge from the applicator gun.
c
Pierce the front 'nozzle' end of the cartridge to its
maximum diameter.
d
Fit the pre-cut nozzle shown at
S
.
e
Install the cartridge in the applicator gun.
Note 2
: Cold material will be very difficult to extrude. The
cartridges must be pre-heated in a special oven (see
Service Tools
) for 1 hour to a temperature of 80°C (176°F).
Pre-heating the cartridges makes the adhesive more
workable and also brings the 'curing' time down to 30
minutes.
6
Apply the pre-heated adhesive to the glass (do not start
in a corner). Keep the nozzle guide
T
against the edge
of the glass and make sure that the adhesive forms a
continuous 'pyramid' shape.
Note 3
: Once the pre-heated adhesive has been applied to
the glass, install the glass in the aperture as soon as
possible. After approximately 10 minutes the sealant will
form a 'skin', this will prevent the glass from bonding.
7
After applying the adhesive, leave a small amount of
sealant protruding from the nozzle. This will prevent any
adhesive left in the cartridge from 'curing'.
Installing the New Glass
1
If the internal trim strip is damaged, renew it (cut to
length as required) before fitting the new glass. Make
sure the two spacer blocks are in position (see step 1 of
Preparing the New Glass
).
2
Install the glass in the frame aperture:
a
ALWAYS use the special lifting tools when moving
the glass. Use a lifting strap to hold large panes of
glass in position as shown
W
.
b
Sit the bottom edge of the glass on the spacer
blocks as shown
X
.
c
Make sure that the glass is correctly positioned, then
gently press around the edges of the glass and
ensure full adhesive contact is achieved. Do not
press too hard or too much adhesive will squeeze
out.
Section B
Body & Framework
9803/6410
Section B
1 - 5
Issue 1
Cab
S
T
10-15 mm
8-10 mm
A186410
S189910
S189930
A186410
T
W
X
Содержание JS130
Страница 39: ...3 3 Section 3 Routine Maintenance 9803 6410 Section 3 3 3 Issue 1 Greasing continued Excavator End...
Страница 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Страница 118: ......
Страница 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Страница 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Страница 145: ...5 6 Section C Electrics 9803 6410 Section C 5 6 Issue 1 Pump Control Cushioned Boom Starting continued Flow Chart...
Страница 148: ...5 9 Section C Electrics 9803 6410 Section C 5 9 Issue 1 Pump Control Pressure Increasing System continued Flow Chart...
Страница 155: ...5 16 Section C Electrics 9803 6410 Section C 5 16 Issue 1 Pump Control Power Supply Cut Delay Flow Chart...
Страница 159: ...5 20 Section C Electrics 9803 6410 Section C 5 20 Issue 1 Pump Control Swing brake Swing lock continued Flow Chart...
Страница 160: ...5 21 Section C Electrics 9803 6410 Section C 5 21 Issue 1 Pump Control Lever Lock Circuit Diagram Time Chart...
Страница 161: ...5 22 Section C Electrics 9803 6410 Section C 5 22 Issue 1 Pump Control Lever Lock continued Flow Chart...
Страница 207: ......
Страница 209: ......
Страница 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Страница 211: ...Section E Section E Hydraulics 9803 6410 Issue 2 3 5 3 5 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 212: ...Section E Section E Hydraulics 9803 6410 Issue 1 3 6 3 6 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 234: ...14 1 Section E Hydraulics 9803 6410 Section E 14 1 Issue 1 JS00010 Hydraulic Pump Regulator Dismantling and Assembly...
Страница 278: ...32 2 Hydraulic Circuit Diagram Section E Hydraulics 9803 6410 Section E 32 2 Issue 1 Control Valve JS01700...
Страница 279: ...33 1 Neutral Circuit Section E Hydraulics 9803 6410 Section E 33 1 Issue 1 Control Valve JS01610...
Страница 284: ...33 6 Boom Raise BM Operation Section E Hydraulics 9803 6410 Section E 33 6 Issue 1 Control Valve L...
Страница 287: ...33 9 Slew Operation SW Priority Circuit Section E Hydraulics 9803 6410 Section E 33 9 Issue 1 Control Valve JS01770...
Страница 293: ...Hydraulics 9803 6410 Issue 1 34 3 34 3 Section E Section E Control Valve JS01820 Dismantling and Assembly cont d...
Страница 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...