4 - 8
Auxiliary Relief Valves (continued)
Boom Ram
1
Prepare the machine
a
Put the operator levers into neutral and lower the
gate lock lever. Start the engine and park the
machine on level ground. Operate the dipper out
and lower the boom to set the bucket on the
ground. Stop the engine. Release the hydraulic oil
tank pressure. (See
Releasing Tank Pressure
).
b
Connect a 0 - 400 bar (0 - 6000 lb/in
2
) pressure
gauge and adaptor to port
G2
on the hydraulic
pump (see view
A
on page 4 - 1).
2
If not already done, temporarily increase the pressure
setting of the MRV (see
Auxiliary Relief Valves
,
General
, step 2).
3
Start the engine, lower the gate lock lever and run the
engine at maximum no-load speed in the
S
mode.
4
Pressure Adjustment
Boom up
Note:
For accurate setting, the pressure should be adjusted
up
to the required level. Release lock nut
X
. Adjust setting
screw
Y
to indicate a pressure below the required level and
then bring the pressure back up for final setting. Tighten lock
nut
X
.
a
Fully raise the boom and then continue to operate
the right control lever as at
A
.
b
The pressure gauge reading should be compared to
the technical data at the start of the section. If it is
outside the limits, adjust ARV
B
.
Section E
Hydraulics
9803/6410
Section E
4 - 8
Issue 1
Pressure Testing
A
A
A296530
289910
X
X
Y
Y
B
B
296590a
306490
Содержание JS130
Страница 39: ...3 3 Section 3 Routine Maintenance 9803 6410 Section 3 3 3 Issue 1 Greasing continued Excavator End...
Страница 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Страница 118: ......
Страница 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Страница 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Страница 145: ...5 6 Section C Electrics 9803 6410 Section C 5 6 Issue 1 Pump Control Cushioned Boom Starting continued Flow Chart...
Страница 148: ...5 9 Section C Electrics 9803 6410 Section C 5 9 Issue 1 Pump Control Pressure Increasing System continued Flow Chart...
Страница 155: ...5 16 Section C Electrics 9803 6410 Section C 5 16 Issue 1 Pump Control Power Supply Cut Delay Flow Chart...
Страница 159: ...5 20 Section C Electrics 9803 6410 Section C 5 20 Issue 1 Pump Control Swing brake Swing lock continued Flow Chart...
Страница 160: ...5 21 Section C Electrics 9803 6410 Section C 5 21 Issue 1 Pump Control Lever Lock Circuit Diagram Time Chart...
Страница 161: ...5 22 Section C Electrics 9803 6410 Section C 5 22 Issue 1 Pump Control Lever Lock continued Flow Chart...
Страница 207: ......
Страница 209: ......
Страница 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Страница 211: ...Section E Section E Hydraulics 9803 6410 Issue 2 3 5 3 5 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 212: ...Section E Section E Hydraulics 9803 6410 Issue 1 3 6 3 6 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 234: ...14 1 Section E Hydraulics 9803 6410 Section E 14 1 Issue 1 JS00010 Hydraulic Pump Regulator Dismantling and Assembly...
Страница 278: ...32 2 Hydraulic Circuit Diagram Section E Hydraulics 9803 6410 Section E 32 2 Issue 1 Control Valve JS01700...
Страница 279: ...33 1 Neutral Circuit Section E Hydraulics 9803 6410 Section E 33 1 Issue 1 Control Valve JS01610...
Страница 284: ...33 6 Boom Raise BM Operation Section E Hydraulics 9803 6410 Section E 33 6 Issue 1 Control Valve L...
Страница 287: ...33 9 Slew Operation SW Priority Circuit Section E Hydraulics 9803 6410 Section E 33 9 Issue 1 Control Valve JS01770...
Страница 293: ...Hydraulics 9803 6410 Issue 1 34 3 34 3 Section E Section E Control Valve JS01820 Dismantling and Assembly cont d...
Страница 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...