3 - 1
General Notes
For the type of grease to use at each point,
see
Lubricants
and Capacities
.
Do not mix different types of grease. Keep them separate.
Slew Ring Bearing
1
The three grease nipples are grouped together on the
front of the machine
.
Slew Ring Teeth and Slew Pinion
Ensure slew ring is kept full of grease. Always grease
whenever the machine has been steam-cleaned.
For location of the slew ring gear refer to
component
Location Diagrams
.
1
Make the Machine Safe
Stop the engine and remove the starter key.
2
Grease the Slew Ring
a
Remove the Inspection port cover
A
(on the
lower centre section).
b
Remove the grease discharge port cover
B
(on
the lower inner side).
c
Remove contaminated grease.
d
Replace the discharge port cover.
e
Apply grease to the slew ring via aperture
C
.
3
Slew the Machine
Start the engine and slew the machine a few degrees.
Stop the engine, remove the starter key and apply
grease again.
Repeat until the whole ring is greased. Check that
grease exudes around the entire circumference.
4
Refit the Cover
!
!
WARNING
You will be working close into the machine for these
jobs. Lower the attachments if possible. Remove the
starter key and disconnect the battery. This will prevent
the engine being started.
8-3-1-3
Section 3
Routine Maintenance
9803/6410
Section 3
3 - 1
Issue 1
Greasing
Содержание JS130
Страница 39: ...3 3 Section 3 Routine Maintenance 9803 6410 Section 3 3 3 Issue 1 Greasing continued Excavator End...
Страница 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Страница 118: ......
Страница 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Страница 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Страница 145: ...5 6 Section C Electrics 9803 6410 Section C 5 6 Issue 1 Pump Control Cushioned Boom Starting continued Flow Chart...
Страница 148: ...5 9 Section C Electrics 9803 6410 Section C 5 9 Issue 1 Pump Control Pressure Increasing System continued Flow Chart...
Страница 155: ...5 16 Section C Electrics 9803 6410 Section C 5 16 Issue 1 Pump Control Power Supply Cut Delay Flow Chart...
Страница 159: ...5 20 Section C Electrics 9803 6410 Section C 5 20 Issue 1 Pump Control Swing brake Swing lock continued Flow Chart...
Страница 160: ...5 21 Section C Electrics 9803 6410 Section C 5 21 Issue 1 Pump Control Lever Lock Circuit Diagram Time Chart...
Страница 161: ...5 22 Section C Electrics 9803 6410 Section C 5 22 Issue 1 Pump Control Lever Lock continued Flow Chart...
Страница 207: ......
Страница 209: ......
Страница 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Страница 211: ...Section E Section E Hydraulics 9803 6410 Issue 2 3 5 3 5 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 212: ...Section E Section E Hydraulics 9803 6410 Issue 1 3 6 3 6 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 234: ...14 1 Section E Hydraulics 9803 6410 Section E 14 1 Issue 1 JS00010 Hydraulic Pump Regulator Dismantling and Assembly...
Страница 278: ...32 2 Hydraulic Circuit Diagram Section E Hydraulics 9803 6410 Section E 32 2 Issue 1 Control Valve JS01700...
Страница 279: ...33 1 Neutral Circuit Section E Hydraulics 9803 6410 Section E 33 1 Issue 1 Control Valve JS01610...
Страница 284: ...33 6 Boom Raise BM Operation Section E Hydraulics 9803 6410 Section E 33 6 Issue 1 Control Valve L...
Страница 287: ...33 9 Slew Operation SW Priority Circuit Section E Hydraulics 9803 6410 Section E 33 9 Issue 1 Control Valve JS01770...
Страница 293: ...Hydraulics 9803 6410 Issue 1 34 3 34 3 Section E Section E Control Valve JS01820 Dismantling and Assembly cont d...
Страница 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...