4 - 7
Auxiliary Relief Valves
General
The auxiliary relief valves (ARV’s) are set to a higher pressure
than the main relief valve (MRV). To permit pressure testing
of the ARV’s it is necessary to temporarily adjust the MRV to
a higher setting (refer to view
B
on page 4 - 1). Proceed as
follows:
1
Prepare the machine
a
Put the operator levers into neutral and lower the
gate lock lever. Start the engine and park the
machine on level ground. Operate the dipper out
and lower the boom to set the bucket on the
ground.
b
Run the engine at maximum no-load speed in
the
S
mode.
2
Increase MRV Pressure
Loosen MRV lock nut
Y
and turn pressure adjusting
screw
Y
180° clockwise. Tighten lock nut
X
.
3
Restore Original MRV Pressure
After completion of all ARV pressure testing, loosen
lock nut
X
and turn adjusting screw
Y
, 180° anti-
clockwise and restore the original MRV setting
pressure.
4
Stop the engine
Section E
Hydraulics
9803/6410
Section E
4 - 7
Issue 1
Pressure Testing
296590a
312450
Y
Y
X
X
Содержание JS130
Страница 39: ...3 3 Section 3 Routine Maintenance 9803 6410 Section 3 3 3 Issue 1 Greasing continued Excavator End...
Страница 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Страница 118: ......
Страница 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Страница 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Страница 145: ...5 6 Section C Electrics 9803 6410 Section C 5 6 Issue 1 Pump Control Cushioned Boom Starting continued Flow Chart...
Страница 148: ...5 9 Section C Electrics 9803 6410 Section C 5 9 Issue 1 Pump Control Pressure Increasing System continued Flow Chart...
Страница 155: ...5 16 Section C Electrics 9803 6410 Section C 5 16 Issue 1 Pump Control Power Supply Cut Delay Flow Chart...
Страница 159: ...5 20 Section C Electrics 9803 6410 Section C 5 20 Issue 1 Pump Control Swing brake Swing lock continued Flow Chart...
Страница 160: ...5 21 Section C Electrics 9803 6410 Section C 5 21 Issue 1 Pump Control Lever Lock Circuit Diagram Time Chart...
Страница 161: ...5 22 Section C Electrics 9803 6410 Section C 5 22 Issue 1 Pump Control Lever Lock continued Flow Chart...
Страница 207: ......
Страница 209: ......
Страница 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Страница 211: ...Section E Section E Hydraulics 9803 6410 Issue 2 3 5 3 5 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 212: ...Section E Section E Hydraulics 9803 6410 Issue 1 3 6 3 6 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 234: ...14 1 Section E Hydraulics 9803 6410 Section E 14 1 Issue 1 JS00010 Hydraulic Pump Regulator Dismantling and Assembly...
Страница 278: ...32 2 Hydraulic Circuit Diagram Section E Hydraulics 9803 6410 Section E 32 2 Issue 1 Control Valve JS01700...
Страница 279: ...33 1 Neutral Circuit Section E Hydraulics 9803 6410 Section E 33 1 Issue 1 Control Valve JS01610...
Страница 284: ...33 6 Boom Raise BM Operation Section E Hydraulics 9803 6410 Section E 33 6 Issue 1 Control Valve L...
Страница 287: ...33 9 Slew Operation SW Priority Circuit Section E Hydraulics 9803 6410 Section E 33 9 Issue 1 Control Valve JS01770...
Страница 293: ...Hydraulics 9803 6410 Issue 1 34 3 34 3 Section E Section E Control Valve JS01820 Dismantling and Assembly cont d...
Страница 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...