© JBG-HT (v.2.0)
65
INSTRUCTION MANUAL
– HEAT PUMP
Heat pump startup checklist
HEAT PUMP INSTALLATION
Was the device installed according to the instructions ☐ YES*
Indoor Unit:
Installation site is dry and protected from frost ☐ YES*
Installation spacing is maintained ☐ YES*
The unit has been leveled ☐ YES*
Outdoor Unit:
Installation spacing is maintained ☐ YES*
The unit has been leveled ☐ YES*
Ground mounting ☐ YES*, height above ground: …….cm
Type of assembly: stand + rubber feet ☐ YES / optional rubber base ☐ YES
Acoustic separation (the water system does not transmit vibrations to the building structure) ☐ YES*
Outdoor Unit – Protective Area:
Dimension of the protective area in accordance with the requirements of the installation instructions ☐ YES*
No openings in the building (windows, vent openings, doors, etc.) ☐ YES*
No open lines in the sewer system, or cavities where escaping refrigerant could accumulate ☐ YES*
No ignition sources (lamps, electrical sockets, lights, etc.) ☐ YES*
Condensate drainage:
No direct connection to the sewer system ☐ YES*
Gravel ballast/absorbent substrate ☐ YES*
Heating wire inserted into the condensate drain funnel and connected ☐ YES*
No siphons in the condensate drainage ☐ YES*
Condensate drain protected from frost ☐ YES*
Checking the drainage of condensate flow ☐ YES*
* - mandatory fields - condition for starting up the device
Содержание ZHHS-01-10K-R290-V5-M
Страница 2: ......
Страница 69: ...JBG HT v 2 0 69 INSTRUCTION MANUAL HEAT PUMP...