© JBG-HT (v.2.0)
47
INSTRUCTION MANUAL
– HEAT PUMP
5.6. Options and settings
Calendar CWU – DHW schedule
Calendar CH – schedule plant
Device – advanced settings
Parameter – Heater settings
Settings – Date/time and other
Service – service technician settings
5.6.1.
CH/DHW Calendar
Calendar activation
5.6.2.
Calendar
Operation modes of the installation
during schedule activity:
Inactive
Comfort
Off
Boost
Economic
5.6.3.
Setting a schedule
The working day of the unit can be divided into 4 periods, for which you need to set a time interval and assign
an operating mode.
The value is changed by operating with the up and
down arrows.
Confirm
and cancel
.
The icon
can be used to copy the settings
parameters of one day to the next.
Содержание ZHHS-01-10K-R290-V5-M
Страница 2: ......
Страница 69: ...JBG HT v 2 0 69 INSTRUCTION MANUAL HEAT PUMP...