List of Figures
ix
VIS-CAM Systems
List of Figures
Figure 1.
VIS elements
.............................................................................................. 2
Figure 2.
Back shot VIS installation.
.............................................................................. 3
Figure 3.
Typical Over Lane Site Layout
......................................................................... 5
Figure 4.
Typical Over Lane Site Layout Plan.
.................................................................. 6
Figure 5.
VIS 300 U.S. Camera options chart.
.................................................................. 8
Figure 6.
VIS 350 U.S. Camera options chart
................................................................... 9
Figure 7.
VIS 400 U.S. Camera options chart
................................................................. 10
Figure 8.
VIS 500 U.S. Camera options chart
................................................................. 11
Figure 9.
VIS 300 European Camera options chart.
.......................................................... 12
Figure 10.
VIS 350 European Camera options chart
........................................................... 13
Figure 11.
VIS 400 European Camera options chart
........................................................... 14
Figure 12.
VIS 500 European Camera options chart
........................................................... 15
Figure 13.
Typical side of road installation.
.................................................................... 16
Figure 14.
Typical side of road installation plan view with no canopy/overhead structue.
........... 16
Figure 15.
Flash and camera distances.
......................................................................... 17
Figure 16.
Install the traffic light sensor.
...................................................................... 18
Figure 17.
TLS-300 signal and power cable.
.................................................................... 19
Figure 18.
Installing the TLS-300 through the mounting pipe and flange.
............................... 19
Figure 19.
Pipe clamps should be about 6-inches apart on a vertical surface.
......................... 20
Figure 20.
Camera Installation
.................................................................................... 20
Figure 21.
Camera mount template.
............................................................................ 21
Figure 22.
Camera cabling as it appears before electrical installation.
.................................. 21
Figure 23.
Cable final wiring.
..................................................................................... 22
Figure 24.
Properly wired X-4 connector.
...................................................................... 23
Figure 25.
Back of the video camera.
........................................................................... 23
Figure 26.
VIS CAM connections.
................................................................................. 25
Figure 27.
TLS 300 to J-Panel wiring.
........................................................................... 26
Figure 28.
X-6 Power input connection.
........................................................................ 27
Figure 29.
Wiring for the X8 to converter connector.
........................................................ 28
Figure 30.
Test trigger
............................................................................................. 29
Figure 31.
Two lane controller.
.................................................................................. 30
Figure 32.
TNF-31 flash unit
....................................................................................... 30
Figure 33.
S3 switch setting
....................................................................................... 31
Figure 34.
Connecting an AC flash.
.............................................................................. 31
Figure 35.
Connection for LVD to VIS CAM.
..................................................................... 32
Figure 36.
Example of a network connection using a local switch.
........................................ 35
Figure 37.
Initial Camera Alignment Display example.
....................................................... 37
Figure 38.
Roll Bar Display example.
............................................................................ 38
Figure 39.
Readjustment of camera tilt and zoom display.
................................................. 39
Figure 40.
Focus Bar marker display.
............................................................................ 40
Figure 41.
Focus Bar Waveform display.
........................................................................ 41
Figure 42.
Focus Bar Waveform Display with waveform cursors.
........................................... 42
Figure 43.
Connection requirements.
........................................................................... 44
Figure 44.
Component layout of the EN board.
................................................................ 45
Figure 45.
Board connections
..................................................................................... 46
Figure 46.
Interface drawing.
..................................................................................... 47
Figure 47.
Electrical interface
.................................................................................... 47
Figure 48.
Physical interface table.
............................................................................. 48
Figure 49.
Category 5 or 6 wiring diagram.
.................................................................... 49
Figure 50.
Flash connections.
..................................................................................... 49
Содержание VIS-CAM System
Страница 1: ...VIS CAM System Vehicle Imaging Subsystem Document Version 10436 Document P N E...
Страница 2: ......
Страница 12: ...VIS CAM Systems xii List of Tables...
Страница 20: ...VIS CAM Systems 8 Preparing for Installation Figure 5 VIS 300 U S Camera options chart...
Страница 21: ...Preparing for Installation 9 VIS CAM Systems Figure 6 VIS 350 U S Camera options chart...
Страница 22: ...VIS CAM Systems 10 Preparing for Installation Figure 7 VIS 400 U S Camera options chart...
Страница 23: ...Preparing for Installation 11 VIS CAM Systems Figure 8 VIS 500 U S Camera options chart...
Страница 24: ...VIS CAM Systems 12 Preparing for Installation Figure 9 VIS 300 European Camera options chart...
Страница 25: ...Preparing for Installation 13 VIS CAM Systems Figure 10 VIS 350 European Camera options chart...
Страница 26: ...VIS CAM Systems 14 Preparing for Installation Figure 11 VIS 400 European Camera options chart...
Страница 27: ...Preparing for Installation 15 VIS CAM Systems Figure 12 VIS 500 European Camera options chart...
Страница 92: ...VIS CAM Systems 80 Appendix B Figure 90 Lane controller setup...
Страница 100: ...VIS CAM Systems 88 Appendix E Figure 98 Operation configuration of Serial port 1...
Страница 110: ......
Страница 111: ......