Individual tests
Wiring test
-Disconnect all nodes
-Terminate CAN bus
on both ends
OK Start test
Wiring test
Status: scanning
Wiring test
▼
CAN_H ->
CAN_L : 65
Ω
[OK]
CAN_GND : 1.56k
Ω
[OK]
CAN_SHLD: >1M
Ω
[OK]
GND : >1M
Ω
[OK]
During the measurement, one line is take as a reference (measuring point 1) and
the resistance is measured against all other lines (measuring point 2).
The test result shows the measuring point 1 in the header. The list of the measur-
ing points 2 follows with the resistance values. This is followed by a blank line.
The symbol
▼
in the header means that not all test results fit on the display. Scroll
through the test results with the key DOWN.
Wiring test
▲
▼
CAN_L ->
CAN_GND : 1.54k
Ω
[OK]
CAN_SHLD: >1M
Ω
[OK]
GND : >1M
Ω
[OK]
CAN_V+ ->