10. Disengage the thrust-bearing lockwasher (382) from the lock nut (136) and remove both from the
shaft.
11. Remove the bearings (112 and 409) from the shaft using a suitable puller that only contacts the in-
ner races of the bearings.
1
1.
Bearing pullers.
6.4.14 Guidelines for i-ALERT
®
2 Equipment Health Monitor disposal
Precautions
WARNING:
•
Explosive hazard and risk of personal injury. Heating to high temperatures could cause
combustion of the condition monitor. Never heat the condition monitor to temperatures in
excess of 149°C | 300°F or dispose of in a fire.
6.4.15 Disassemble the spring-mounted baseplate (first generation)
1.
Raise or support the baseplate above the foundation/floor. Be sure to allow enough room under the
baseplate to install the spring assemblies.
2.
Set the bottom adjusting nuts on each spring stud to height indicated on the certified dimensional
drawing.
3.
Insert a washer between the bottom adjusting nut and the spring follower. Install a spring and an-
other follower. Install this subassembly from the bottom of the baseplate.
4.
Install the upper half of the spring assembly consisting of a follower, a spring, another follower, and
a flat washer. Now install the top adjusting nut and jam nut. Tighten finger tight.
5.
Repeat steps one through four for all the spring assemblies.
6.
Once all the springs have been installed, lower the unit on to the foundation pads.
The foundation pads are supplied by the customer. They are to be 16-20 micro-inch surface finish
315 stainless steel plate.
7.
Level the baseplate while making final height adjustments. Adjust the baseplate height by loosening
the top jam nut and adjusting nut. Change the height by moving the lower adjusting nut. When the
baseplate is level, tighten the top adjusting nuts just enough to make sure the top springs are not
loose in their followers and then snug the lower and upper jam nuts.
6.4 Disassembly
Models 3180, 3181, 3185, and 3186 Installation, Operation, and Maintenance Manual
93
Содержание GOULDS PUMPS 3180
Страница 1: ...Installation Operation and Maintenance Manual Models 3180 3181 3185 and 3186 ...
Страница 2: ......
Страница 153: ...9 1 Certificates of conformance Models 3180 3181 3185 and 3186 Installation Operation and Maintenance Manual 151 ...
Страница 155: ...9 1 Certificates of conformance Models 3180 3181 3185 and 3186 Installation Operation and Maintenance Manual 153 ...