0°
0°
> 5°
Support batten position for installation at the gutter
X (mm)= 435(mm) + M
Reference support batten(d)*
* Reference synopsis
12.2.3)
The bottom part (at the gutter) of the PV field must be at the same
level
than the rest of the PV field.
If this
is not the case the 435mm position is not any more applicable, it’s
necessary the raise the PV
field
further up.
29
“M” to be
measured on the roof by observing the
conditions described here
Reverse slope FORBIDDEN
PV field
positioned
at the gutter/eave