Assembly guide for EASY ROOF EVOLUTION L-1
In
fo
rm
at
io
n
et
v
is
u
el
s
n
o
n
c
o
n
tr
ac
tu
el
s.
S
o
u
s
rés
er
ve
d
e
m
o
d
if
ic
at
io
n
s
tec
h
n
iq
u
es
s
an
s
p
réavi
s.
This document is the property of IRFTS. It shall not be reproduced or shared with third parties without IRFTS agreement
Model “L-1” 60 Cells 6” Portrait
Installation of the bottom
metal
sheet
12.2.4)
Add a batten or a support batten under the bottom
metal sheet to support this one.
This batten
will at least make all the width of the PV field.
The thickness of this
batten will be identical to the
thickness of the support batten (d)*.
Align the batten
with the higher edge of the
bottom
metal
sheet
Bottom
metal
sheet in
transparency
(View of top)
Set up and fasten the bottom
metal
sheet all over the width of the PV field. Fasten
only the top part of
the bottom
metal
sheet.
* Reference nomenclature
31
PV field
positioned
at the gutter/eave