Assembly guide for EASY ROOF EVOLUTION L-1
In
fo
rm
at
io
n
et
v
is
u
el
s
n
o
n
c
o
n
tr
ac
tu
el
s.
S
o
u
s
rés
er
ve
d
e
m
o
d
if
ic
at
io
n
s
tec
h
n
iq
u
es
s
an
s
p
réavi
s.
This document is the property of IRFTS. It shall not be reproduced or shared with third parties without IRFTS agreement
12.2.1)
Set up the first support batten
at 435 mm from the first batten
or the eave
batten (tilting
lath).
Screw the support batten
following the recommendations page
17 to 20 to know the type and the number of screws to be
used.
.
* Reference nomenclature
12.2.2)
Model “L-1” 60 Cells 6” Portrait
Reference support batten (d)*
PV field
positioned
at the gutter/eave
Positioning of the flooring
at the gutter/eave
This section of the assembly guide relates only to the installations of PV field
positioned
at the gutter/eave
CAUTION:
The low part of PV field (with the gutter) must
imperatively be on the same plan as the flooring of the system.
In the contrary case the dimension of 435 mm is not applicable
any more.
It is necessary to go move up the PV field in the rake
direction.
The dimension of positioning must be redefined, see
page 29.
0°
Reverse slope FORBIDDEN
Remove the tiles
of the photovoltaic field, for L and H to see page 12 and 13
H
L
28
PV field
positioned
at the gutter/eave