Assembly guide for EASY ROOF EVOLUTION L-1
In
fo
rm
at
io
n
et
v
is
u
el
s
n
o
n
c
o
n
tr
ac
tu
el
s.
S
o
u
s
rés
er
ve
d
e
m
o
d
if
ic
at
io
n
s
tec
h
n
iq
u
es
s
an
s
p
réavi
s.
This document is the property of IRFTS. It shall not be reproduced or shared with third parties without IRFTS agreement
12.1.1)
Remove the tiles
of the photovoltaic field, for
L and H to see page 17 and 18
* Reference nomenclature
12.1.2)
Model “L-1” 60 Cells 6” Portrait
H
L
PV field
centered on rake direction
This section of the installation manual relates only to
installation of PV field
centered in the rake direction.
For the installations on the eave go directly on page
28 of this document
Definition of bottom
flashing support batten
(side view)
Y = X - 8 mm MINI
1°) Define the thickness of the bottom
flashing
batten
according to the thickness of the support batten
(d)*.
Reference Support
batten (d)*
(G)
(F)
(K)
X
Y
X: thickness of (d)
Y: thickness of (G) and
(H)
(F)
2°) Position the batten (F) in order to have the top of the bottom
flashing
batten (H) flush with the
water flow of the tile, eventually
slightly
higher (a few millimeters).
(H)
25
The bottom
flashing
batten (G and K) must
have a thickness 8 mm lower than those of the
support batten (d).
Instruction for the assembly of the Easy-Roof system
12)