Assembly guide for EASY ROOF EVOLUTION L-1
In
fo
rm
at
io
n
et
v
is
u
el
s
n
o
n
c
o
n
tr
ac
tu
el
s.
S
o
u
s
rés
er
ve
d
e
m
o
d
if
ic
at
io
n
s
tec
h
n
iq
u
es
s
an
s
p
réavi
s.
This document is the property of IRFTS. It shall not be reproduced or shared with third parties without IRFTS agreement
Model “L-1” 60 Cells 6” Portrait
Installation of the bottom
metal
sheet
12.2.4)
The bottom
metal sheet must be aligned with the frames on each side of the PV field.
Position all the frames of the first line while proceeding as indicated page 28. Do a marking at each
end on the wood.
Then
slide the frames upward
slightly.
(view with fictitious frames)
Marking
(view with fictitious frames)
(view with fictitious frames)
Marking
Cut the top batten of the double lath 250mm wider
than the marking
so that the remaining
batten
is
on the same level as the reference support batten. If the barge board is too high, cut it again along all
the length of the batten that was removed previously.
250 mm
250 mm
33
PV field
positioned
at the gutter/eave