Assembly guide for EASY ROOF EVOLUTION L-1
In
fo
rm
at
io
n
et
v
is
u
el
s
n
o
n
c
o
n
tr
ac
tu
el
s.
S
o
u
s
rés
er
ve
d
e
m
o
d
if
ic
at
io
n
s
tec
h
n
iq
u
es
s
an
s
p
réavi
s.
This document is the property of IRFTS. It shall not be reproduced or shared with third parties without IRFTS agreement
Synopsis
3
12.
Instruction for the assembly of the Easy-Roof system
.................................................................. 21
12.1.1.
PV field centered on rake direction .................................................................................. 25
12.1.2.
Definition of bottom flashing support batten .................................................................. 25
12.1.3.
Installation of the bottom flashing support batten and the reference support batten .. 26
12.1.4.
Installation of the bottom flashing ................................................................................... 27
12.2.
PV field positioned along the guttering
12.2.2.
Positioning of the flooring at the gutter/eave ................................................................. 28
12.2.3.
Support batten position for installation at the gutter ..................................................... 29
12.2.4.
Installation of the bottom metal sheet ....................................................................... 30 to 33
12.3.
Flooring installation for all PV installation ................................................................................ 34
12.3.1.
Flooring for an assembly with 4 fixings per module ........................................................ 35
12.3.2.
Flooring for an assembly with 6 fixings per module ..................................................... 36-37
12.3.3.
Installation of leaning batten ........................................................................................... 38
12.4.
Installation of the EASY ROOF system ...................................................................................... 39
12.4.1.
Installation of underlay film ............................................................................................. 39
12.4.2.
Installation of the bottom metal sheet ....................................................................... 40 to 45
12.4.3.
Installation and fixing of the left flashing ..................................................................... 46-47
12.4.4.
Installation and fixing of the right flashing ................................................................... 48-49
12.4.5.
Installation and fixing of the support frames and brackets on the edge of the field ... 50-51
12.5.
Installation of the Photovoltaic panels .................................................................................. 51-53
12.5.1.
Grounding ......................................................................................................................... 54
12.6.
Put back the tiles ...................................................................................................................... 55
Annex 1 Pyramid installation ................................................................................................................ 56-62
Annex 2 Lateral Edge installation ............................................................................................................. 63
Annex 3 Tile’s alignment over the Top Flashing ................................................................................... 64-65
Annex 4 Compatibility module .............................................................................................................. 66-67
Annex 5 Connection of the PV cables and grounding ...................................... ........................................68-74
Annex 6 Glazing stops and deflector assembly ..................................................................................... 75-84
Annex 7 Side border strip option ............................................................................................................. 85
Annex 8 Slate roofs - Metal flashing .................................................................................................... 86-106
Annex 9 Metal flashings to be tailor made ......................................................................................... 107-109
Annex 10 Assembly instructions for UK with battens 50 x 25 mm ......................................................... 110
Model “L-1” 60 Cells 6” Portrait