Assembly guide for EASY ROOF EVOLUTION L-1
In
fo
rm
at
io
n
et
v
is
u
el
s
n
o
n
c
o
n
tr
ac
tu
el
s.
S
o
u
s
rés
er
ve
d
e
m
o
d
if
ic
at
io
n
s
tec
h
n
iq
u
es
s
an
s
p
réavi
s.
This document is the property of IRFTS. It shall not be reproduced or shared with third parties without IRFTS agreement
12.2.4)
Model “L-1” 60 Cells 6” Portrait
Replace the first tile at the lower left
corner, Position the first frame (1) at a
distance of 40 mm MAXIMUM of the edge
of the tile.
32
Installation of the bottom
metal
sheet
PV field
positioned
at the gutter/eave
DO NOT SCREW THESE SCREWS IN
REFERENCE SUPPORT BATTEN.
MUST REMOVE SCREWS BEFORE THE
MOUNTING OF THE PV MODULES.
* Reference nomenclature
Situation A - Assembly on a roof without counter
battening
Situation B - Assembly on a roof with counter
battening
40 mm MAXI
(See page 11 to centre the
field)
Reference support
batten (d)*
Position the frame (1) in the rake direction
using two screws of Ø 5 placed in the
openings indicated and put them
leaning
against the reference support batten (d)
Reference support
batten (d)* at the Top