
Part No. 715-0088, Rev. B
- 66 -
5.11. AeroNOx 2.0 Gas Testing Procedure
This document contains detailed instructions for performing the gas test on the AeroNOx
2.0 with sensors. The device must have a battery connected to function properly, even
with external power applied to the DC jack. This procedure applies to all AeroNOx 2.0
units manufactured by International Biomedical and is to be performed as part of the
AeroNOx 2.0 production process or as part of the servicing process. Leak check and
sample rate adjustment procedures must be completed first.
5.11.1.
Tools and Materials
738-1850
AeroNOx2, Calibration Circuit
5 , one dedicated to each: O
2
, 80 ppm NO, 45 ppm NO, 9 ppm NO
2
, and 5
ppm NO
2
use
731-9141
Calibration Regulator with CGA 625 Fitting
4 , one dedicated for each: 80 ppm NO, 45 ppm NO, 9 ppm NO
2
, and 5
ppm NO
2
use
201-0055
Female CGA 660 to Male CGA 625 Adapter
4 , one dedicated for each: 80 ppm NO, 45 ppm NO, 9 ppm NO
2
, and 5
ppm NO
2
use
Compressed Oxygen Cylinder and regulator with 1240 DISS output
731-9130
Flowmeter, Oxygen - Classic 0-16 (or equivalent)
731-0127
Hose Assy, Oxy, 6, Supply (or equivalent)
5.11.2.
General Instructions
5.11.2.1. If at any point during the testing procedure the AeroNOx 2.0 is
unable to meet the testing specifications, remove the AeroNOx 2.0
from testing and contact International Biomedical.
5.11.2.2. Ensure that the AeroNOx 2.0 to be tested:
Has been plugged in with the battery connected for at least 48
hours prior to being gas tested.
NOTE:
This time can be reduced if the NO sensor has been
biased correctly for at least 48 hours.
Is turned on and has been running for at least 5 minutes before
testing, sampling ambient room air
Has successfully completed the AeroNOx 2.0 MFM Flow
Check/Plumbing Leak Test Procedure and the AeroNOx 2.0
Sample Rate Adjustment Procedure
Record
confirmation of other procedures completion and attach.
Содержание AeroNO 2.0
Страница 1: ......
Страница 3: ...This page intentionally left blank ...
Страница 6: ...Par rt No 715 008 88 Rev B LA ANGUAG GE DIS 3 SCLAIM MER ...
Страница 7: ...Par rt No 715 008 88 Rev B LA ANGUAG GE DIS 4 SCLAIM MER ...
Страница 8: ...Par rt No 715 008 88 Rev B LA ANGUAG GE DIS 5 SCLAIM MER ...
Страница 9: ...Par rt No 715 008 88 Rev B LA ANGUAG GE DIS 6 SCLAIM MER ...
Страница 10: ...Par rt No 715 008 88 Rev B LA ANGUAG GE DIS 7 SCLAIM MER ...
Страница 11: ...Par rt No 715 008 88 Rev B LA ANGUAG GE DIS 8 SCLAIM MER ...
Страница 12: ...Par rt No 715 008 88 Rev B LA ANGUAG GE DIS 9 SCLAIM MER ...
Страница 26: ...Par rt No 715 008 2 13 2 14 88 Rev B Physical D VESA Mou Dimensions unting Patte and Cente ern 23 er of Mass ...
Страница 78: ...Par rt No 715 008 88 Rev B 5 12 3 Re 5 12 4 Fr ear Interna ront Intern al Layout al Layout 75 ...
Страница 94: ......
Страница 95: ...Par rt No 715 008 7 3 88 Rev B Nitric Oxid de Sensor S Specificatio 92 ns ...
Страница 96: ...Par rt No 715 008 88 Rev B 93 ...
Страница 97: ...Par rt No 715 008 7 4 88 Rev B NO2 Senso or Specifica ations 94 ...
Страница 98: ...Par rt No 715 008 88 Rev B 95 ...
Страница 99: ...Par rt No 715 008 7 5 88 Rev B Oxygen Se ensor Spec cifications 96 ...
Страница 105: ......