15
Checking the System
Before starting the system, review the following items:
u
All hardware is properly and securely installed in the rack.
u
The cables are properly attached to the base unit, and there is enough slack cable to allow
the base unit to extend from the rack.
u
The cables that run along the sides or top of the rack have clips or ties to secure them in
place.
u
All JBOD or RAID disk drives are installed in the proper slots in the disk drive bay and
are labeled appropriately.
u
The voltage selection switch on the back of the base unit is set to the proper voltage for
your location (115 volts or 230 volts).
u
The power cord from the AC distribution box or UPS is connected to the correct power
outlet.
u
The base unit is retracted into the rack.
WARNING
Once you install equipment into the rack, do not move the rack, or equipment damage
may result. If you must move the rack, first remove all equipment, move the rack to its
new location, and then reinstall the equipment.
Starting the System
WARNING
If you start the system, and then turn it off before completing the instructions in
Chapter 2, “Setting Up the Software,” you will have to reinstall the operating system
and associated system software. See “What’s Next” for more information.
To start the system, press the Power button shown in the following figure. If you have an AC
distribution box or a UPS connected to the system, make sure its power switch is turned on
before you start the system.
See Chapter 2, “Setting Up the Software,” before using the Power button to start the system
for the first time.