Intel® Server System M50FCP1UR System Integration and Service Guide
92
22.
Secure the server board to the chassis using all the fasteners removed in Step 14. (See Letter B),
Tighten to 5 in-lb.
23.
Place and secure the right and left metal air baffles to edges of the server board. Tighten to 5 in-lb.
24.
Re-attach all cables previously disconnected from the server board.
25.
Reinstall processors (see Section 6.5).
26.
Reinstall memory modules and DIMM blanks (see Section 6.3).
27.
Reinstall all options previously removed from the server board.
28.
Reinstall riser card assemblies (see Section 6.6).
29.
Re-attach all internal cables previously detached from PCIe add-in cards. See Section 3.2 for cable
routing.
30.
Reinstall all system fans (see Section 6.2).
31.
Reinstall power supply modules (see Section 6.4).
32.
Reinstall the system top cover (see Section 6.1.2).
Содержание M50FCP1UR
Страница 2: ...2 This page intentionally left blank...
Страница 118: ...Intel Server System M50FCP1UR System Integration and Service Guide 118 1 2 3 4 5 6 1 2 3...
Страница 119: ...Intel Server System M50FCP1UR System Integration and Service Guide 119 1 2 3 4 5...
Страница 120: ...Intel Server System M50FCP1UR System Integration and Service Guide 120 7 8 9 10 11 12 4 5 6...
Страница 121: ...Intel Server System M50FCP1UR System Integration and Service Guide 121 6 7 8 9 10...
Страница 130: ...Intel Server System M50FCP1UR System Integration and Service Guide 130 1 2 3 4 5 ESD 6 1 2 3...
Страница 131: ...Intel Server System M50FCP1UR System Integration and Service Guide 131 1 2 3 4 5...