Intel® Server System M50FCP1UR System Integration and Service Guide
114
2.
Place the front cushion (iPN K65031-001) on the left end of the inner box. Place the rear cushion
(K65006-001) on the right end of the inner box. Then, place bottom foam K75566-001 in the middle. See
the following figure.
3.
Pack the server system with red EPE sheet (iPN K58342-001). See the following figure.
4.
Pack the system wrapped with EPE sheet in the EPE bag. Then, place the system on the bottom foam (see
the following figure). Place the top front foam (iPN K65046-001) on the left and the top rear foam
(iPN K65037-001) on the right.
K65031
-001
K65006
-001
K65046
-001
K65037
-001
Содержание M50FCP1UR
Страница 2: ...2 This page intentionally left blank...
Страница 118: ...Intel Server System M50FCP1UR System Integration and Service Guide 118 1 2 3 4 5 6 1 2 3...
Страница 119: ...Intel Server System M50FCP1UR System Integration and Service Guide 119 1 2 3 4 5...
Страница 120: ...Intel Server System M50FCP1UR System Integration and Service Guide 120 7 8 9 10 11 12 4 5 6...
Страница 121: ...Intel Server System M50FCP1UR System Integration and Service Guide 121 6 7 8 9 10...
Страница 130: ...Intel Server System M50FCP1UR System Integration and Service Guide 130 1 2 3 4 5 ESD 6 1 2 3...
Страница 131: ...Intel Server System M50FCP1UR System Integration and Service Guide 131 1 2 3 4 5...