AAY2000IKI06
vii
Installation manual
Ingeteam Power Technology, S.A.
Table of Contents
2.1.1. Site .......................................................................................................................................11
2.1.2. IP Rating ...............................................................................................................................11
2.1.3. Ambient temperature ..............................................................................................................11
2.1.4. Atmospheric conditions ...........................................................................................................11
2.1.5. Contamination rating ..............................................................................................................11
2.1.6. Noise contamination ...............................................................................................................12
2.1.7. Ventilation ..............................................................................................................................12
2.1.8. Mounting and anchorage surface ..............................................................................................12
3.1. Receipt of the equipment ................................................................................................................14
3.2. Handling .......................................................................................................................................15
3.3. Transport ......................................................................................................................................16
3.4. Storage .........................................................................................................................................16
3.5. Conservation ..................................................................................................................................17
3.6. Waste disposal ...............................................................................................................................17
4.5.1. Inspection tasks .....................................................................................................................20
4.5.2. Operational work ....................................................................................................................21
4.5.3. Manipulation work ..................................................................................................................21
5.1. General installation requirements .....................................................................................................22
5.2. Wall mounting the equipment ..........................................................................................................22
5.3. Electrical connection ......................................................................................................................24
5.3.2. Order in which the equipment connections should be made ........................................................25
5.3.3. System diagram .....................................................................................................................25
5.3.4. Communication ......................................................................................................................25
5.3.5. Analog inputs ........................................................................................................................26
Содержание Ingecon mWind Interface
Страница 1: ...Ingecon Wind Interface Installation manual...
Страница 34: ...Notes...
Страница 35: ...Notes...