AAY2000IKI06
31
Installation manual
Ingeteam Power Technology, S.A.
6. Commissioning
6.1. Equipment inspection
This section contains the instructions for operating the equipment once it is correctly wired and sealed.
The Ingecon
®
μWind Interface units manage all or part of a generating plant. A check should be made to ensure that
the plant status is correct before starting up the units.
Each plant has its own particular characteristics, depending on the country of location and other specific conditions.
In any event, before start-up, it should be ensured that the plant is compliant with all applicable legislation and regula-
tions and that at least the part to be powered up, has been completed.
6.1.1. Inspection
Prior to the equipment power-up, a general inspection of the equipment should be made, primarily consisting in:
Cabling inspection
•
Check that the cables are connected correctly to their connectors located on the bottom of the enclosure.
•
Check that these cables are in good condition and that there are no nearby hazards which could cause them
to deteriorate, such as intense heat sources, sharp objects or devices which could impact against or pull on the
cables.
Check that the equipment is firmly anchored in position
Check that the equipment is firmly anchored and runs no risk of tipping over.
6.1.2. Hermetic seal of the equipment
During installation, a check should be made to ensure that the equipment connection operations have not altered the
IP rating of the equipment.
Ensure that the connectors are correctly tightened, and that the cable glands and front cover are sealed correctly.
Connectors
For all connections through the cable glands, allow sufficient cable hose length to ensure that there is no pull on the
internal electrical connections.
Firmly tighten the cable glands used, in order to ensure that these are airtight.
Cover
If the front cover has been opened at any time, then secure it to the unit with its four screws, following the guidelines
detailed below:
1.
Lubricate the screws.
2.
Ensure that the cover is correctly aligned with the casing. This is easy to see, checking that the cover and
enclosure holes are concentric.
3.
Manually insert the four screws in their threaded holes, starting with the one in the top right, followed by the
bottom left, and finally the other two.
4.
Screw down the screws to a maximum torque per screw of 5 Nm, using a calibrated tool.
5.
Check for airtightness.
The warranty does not cover damage caused by the inadequate sealing of the equipment.
Whenever the equipment is opened, is it mandatory to lubricate the screws before re-closing in order to prevent the
screws from jamming or seizing up.
Содержание Ingecon mWind Interface
Страница 1: ...Ingecon Wind Interface Installation manual...
Страница 34: ...Notes...
Страница 35: ...Notes...