4.5.2.  Operational work

Manual start-up/shutdown of the wind turbine

The IWI is equipped with an ON/OFF button to manually start-up / shutdown the wind turbine. When the button is 
enabled (the LED on the button is on) the IWI unblocks the wind turbine and allows it to operate normally. When the 
button is disabled (LED off), the IWI performs the wind turbine shutdown and subsequent blocking, guaranteeing that 
the wind turbine is stopped from moving.

• 

Any wind present will cause the wind turbine to rotate.

• 

If there is no control over the wind turbine, then its speed of rotation may increase above the 

design limits, leading to bodily injury and/or material damage.

• 

You are advised to use wind turbines equipped with mechanical speed limitation systems 

(mechanical braking devices or by aerodynamic design) to ensure that the speed of rotation 
remains within acceptable values in order to guarantee system safety. 

• 

Before starting up the system, you are advised to use mechanical blocking or the short-

circuiting of the output terminals to prevent the wind turbine from moving.

• 

Once the wind turbine has been connected to the IWI, the latter short circuits the turbine.

• 

Do not turn on the IWI until all the devices have been installed (brake resistor and µWind) 

and grid voltage is available to dissipate the energy produced to the power grid.

4.5.3.  Manipulation work

All tasks not considered to be Inspection or Operational tasks shall be classed as Manipulation tasks.

For manipulation work, you need to ensure that no voltage is present. Follow the protocol detailed below:

1. 

Shutdown the wind turbine. To do so, press the ON/OFF button located on the bottom of the Ingecon

®

 μWind 

Interface. In position OFF, the LED on the button will not light up.

ON/OFF LED

2. 

Once the wind turbine has stopped completely, disconnect the power cable connecting the Ingecon

®

 μWind 

Interface DC output with the Ingecon

®

 µWind DC input. You are advised to disconnect the quick connector from 

the Ingecon

®

 µWind.

3. 

Block the wind turbine using some additional braking system. Disconnect the connection between the wind 

turbine and the Ingecon

®

 μWind Interface, isolate it, sign it and protect it.

4. 

Disconnect the auxiliary power from the Ingecon

®

 μWind Interface.

5. 

Wait 10 minutes for the internal capacitors to discharge and any hot parts to cool down.

6. 

Open the cover and check for the absence of voltage in the work area.

The PPE stated in section “4.4.3. Personal Protection Equipment (PPE)” should be worn for any work on live parts 
indicated in this document.

Содержание Ingecon mWind Interface

Страница 1: ...Ingecon Wind Interface Installation manual...

Страница 2: ...may exist Liability will not be assumed for total concordance The information contained in this document is regularly reviewed and it is possible that there may be changes in subsequent editions Other...

Страница 3: ...for ensuring that such personnel is familiar with the contents of this manual You are reminded that it is mandatory to comply with all applicable safety legislation for electrical work There is an ele...

Страница 4: ...must be followed 1 Disconnect 2 Prevent any possible re connection 3 Check that no voltage is present 4 Ground and short circuit 5 Protect against nearby live equipment where appropriate and place sa...

Страница 5: ...wind turbine and power supply Strictly follow the mandatory voltage disconnection steps contained in this manual DANGER Crushing and joint injuries Always follow the instructions contained in the manu...

Страница 6: ...ting Only then should the equipment be connected following the instructions contained in the manual Do not touch the electronic boards or components The more sensitive components could be damaged or d...

Страница 7: ...t 16 3 4 Storage 16 3 5 Conservation 17 3 6 Waste disposal 17 4 Safety instructions 18 4 1 Contents 18 4 2 Symbols 18 4 3 Definition of the tasks to be performed 18 4 3 1 Inspection tasks 19 4 3 2 Ope...

Страница 8: ...nd turbine 29 Connection to a wind turbine with an AC voltage output 30 Connection to a wind turbine with a DC voltage output 30 5 4 Electrical disconnection 30 6 Commissioning 31 6 1 Equipment inspec...

Страница 9: ...C voltage generated by the wind turbine to the Ingecon Wind DC voltage input Protect the system against an excessive rotational speed and over voltages and also to limit the power intake when the wind...

Страница 10: ...o adapt them to the standards and regulations in all European countries and also those in force in other continents 1 3 1 CE Marking The CE marking is essential for marketing any product in the Europe...

Страница 11: ...at outdoor installation is possible IP65 means that the equipment is fully dust tight and also protected against the impact of water jets in any direction as defined for this protection rating in stan...

Страница 12: ...d 20 cm around the base This is to ensure that the inverter cooling system operates correctly Facilitate the circulation of incoming and outgoing air through the ventilation grids 2 1 8 Mounting and a...

Страница 13: ...20 C Minimum temperature of the surrounding air 20 C Maximum temperature of the surrounding air 70 C Maximum relative humidity with no condensation 95 For more detailed information please refer to Cha...

Страница 14: ...to the sender s address Do not unpack the equipment until it is ready to be installed It should remain in a horizontal position at all times INGETEAM POWER TECHNOLOGY S A Avda Ciudad de la Innovaci n...

Страница 15: ...g should be used Packaging disposal All the packaging can be given to an authorised manager of non hazardous waste In any case each part of the packaging should be disposed of as follows Plastic polys...

Страница 16: ...close as possible to the connection between the fork and the chassis 3 Ensure that the forks are perfectly level to prevent the equipment from possibly being tipped off 4 En any event observe the inst...

Страница 17: ...ation Ingeteam assumes no liability for possible damage if this condition is not met 3 6 Waste disposal During the installation commissioning and maintenance procedures the waste generated must be ade...

Страница 18: ...the presence of hot parts that could cause serious burns All work specific safety warnings and notes are included in each corresponding chapter and are also repeated and completed at the critical poin...

Страница 19: ...ied and authorised by Ingeteam The necessary safety measures must be in place to prevent unauthorised persons from handling the equipment and to keep them away from the vicinity of the equipment Warni...

Страница 20: ...ts inside the equipment time to cool down 4 4 3 Personal Protection Equipment PPE It is mandatory to wear safety footwear compliant with standard EN 345 1 1992 It is also mandatory to wear kid gloves...

Страница 21: ...e latter short circuits the turbine Do not turn on the IWI until all the devices have been installed brake resistor and Wind and grid voltage is available to dissipate the energy produced to the power...

Страница 22: ...onment must be suitable and must comply with the guidelines set out in section 2 System description Furthermore the items used in the rest of the installation must be compatible with the equipment and...

Страница 23: ...stallation manual Ingeteam Power Technology S A location of top screws location of bottom screws 4 Drill the two bottom holes and insert the appropriate screws 5 Check that the equipment is firmly anc...

Страница 24: ...he shutdown protocol explained in 4 5 3 Manipulation work The Ingecon Wind Interface cable ports are located at the bottom of the enclosure Each type is described below Communication To connect the co...

Страница 25: ...equipment is to be located should always be complied with Wiring diagram for the Ingecon Wind TL equipment with a connection to the Ingecon Wind Interface IWI For Ingecon Wind 2 5 TL 3 TL 3 3 TL 3 68...

Страница 26: ...inserted screw down the hood to guarantee the IP65 insulating rating Once the assembly has been completed it will be possible to establish communications with the Ingecon Wind Interface through the qu...

Страница 27: ...e cable gland to ensure that the equipment is airtight The analog input cable diameter must not be greater than 9 mm 5 3 6 DC output The Ingecon Wind Interface and the Ingecon Wind power stages are co...

Страница 28: ...erform the wind turbine emergency stop The resistors must be sized according to the wind turbine characteristics power and output voltage The power delivered by the wind turbine is governed by the fol...

Страница 29: ...R 4 Ohm R 5 Ohm R 6 Ohm R 7 Ohm R 8 Ohm R 9 Ohm R 10 Ohm Peak power W VLL Vrms 3 Ohm 4 Ohm 5 Ohm 6 Ohm 7 Ohm 8 Ohm 9 Ohm 10 Ohm Peak power W 19200 25600 32000 36816 7 31557 1 27612 5 24544 4 22090 VLL...

Страница 30: ...S Never forget that when the wind turbine is moving voltage may be present at its terminals In both cases the wind turbine cable diameter must not be greater than 17 mm R S T 5 4 Electrical disconnec...

Страница 31: ...on Check that the equipment is firmly anchored and runs no risk of tipping over 6 1 2 Hermetic seal of the equipment During installation a check should be made to ensure that the equipment connection...

Страница 32: ...conditions including those specified by the customer for this type of operation The condition of the enclosure A visual inspection should be made of the condition of the enclosure checking the conditi...

Страница 33: ...ny query or problem relating to the equipment please call the Ingeteam customer service Ingeteam Power Technology S A Avda Ciudad de la Innovaci n 13 31621 SARRIGUREN Navarra Spain Tel 34 948 28 80 00...

Страница 34: ...Notes...

Страница 35: ...Notes...

Страница 36: ...00 00 Fax 33 0 5 61 25 00 11 e mail solar energie ingeteam com Ingeteam INC 5201 Great American Parkway Suite 320 SANTA CLARA CA 95054 USA Tel 1 415 450 1869 1 415 450 1870 Fax 1 408 824 1327 e mail...

Отзывы: