![Ingersoll-Rand Free Standing Workstation
Cranes Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/ingersoll-rand/free-standing-workstation-cranes/free-standing-workstation-cranes_product-information_2059335009.webp)
Shim Levelling Method
Non-shrinking
grout as needed
Anchor Bolt
(3/4 in. dia. max)
Hex Nut
Washer
Steel shims
as needed
Concrete
slab
(Dwg. MHP1859)
WARNING
•
If complete rigidity of the system is required, then additional bracing (not
included) is necessary.
n
Column Weldment
Base
Location
Plate
(Dwg. MHP3338)
1. Refer to enclosed general arrangement drawing for recommended dimensions
and Column locations.
2. Complete the marking for the column weldment bases on the floor. Be sure that
the location plate is oriented in the right direction as per the general
arrangement drawing.
3. Drill holes and install anchor bolts (Not included) and hardware according to
Manufacturer’s installation directions and requirements
4. Position the column weldments in place.
5. Plumb the column weldments using the leveling methods listed in Page 8, under
section Anchoring of the System.
n
Header Beam
Refer to Dwg. MHP3341 on page 9.
(Dwg. MHP3341)
1. Lift and position header beam onto two secured column weldments. Refer to
enclosed General Arrangement Drawing for recommended dimensions and
header beam location.
2. Using Column to beam connector kit attach header beam to column weldment.
Refer to Dwg. MHP3331 on page 9.
Column
Weldment
Header Beam
1a
1c
1d
1b
(Dwg. MHP3331)
Item
No.
Description
of Part
Total
Qty
1
Column to Beam Connector Kit
1
1a
Clamp
4
1b
Hex Head Bolt
4
1c
Flat Washer
4
1d
Hex Nut
4
AR: As Required
n
Column to Beam Connector Kit
WARNING
•
A check of corrosion to the exposed elements, and of the tightened torque
should be carried out at regular intervals as provided in the maintenance
schedule.
CAUTION
•
Ingersoll Rand recommends the use of genuine Ingersoll Rand column to
beam connector kit. Replacement parts may result in safety hazards,
decreased performance, increased maintenance and may invalidate all
warranties.
n
Installation of Clamps
Installation should be carried out in accordance with Dwg. MHP3345 on page 9.
A torque wrench must be used to confirm bolts are tightened to the recommended
torque (108 ft-lb) under dry condition.
Though clamps can be reused, Ingersoll Rand recommends thorough inspection for
corrosion or any other warning signs. The bolts and nuts should also be inspected
against overtightening. Any stripping of the threads suggest that the bolt has been
overtightened and it is recommended that you replace the bolt and clamp.
90˚
(Dwg. MHP3345)
Form 24308157 Edition 2
9
Содержание Free Standing Workstation Cranes
Страница 54: ...NOTAS DE SERVIÇO PT 54 Formulário 24308157 ª Edição 2 ...
Страница 55: ...NOTAS DE SERVIÇO PT Formulário 24308157 ª Edição 2 55 ...
Страница 56: ...www ingersollrandproducts com ...