90
88-A951X001-1D-EN
1.
Slide PVC pipe through vent outlet adaptor and insert into inducer
outlet.
2.
Twist to insure PVC is fully inserted.
3.
Tighten the two clamps.
4.
Install the combustion air inlet PVC pipe.
Note:
The vent outlet adapter is used for strain relief against the
weight of the venting. The clamp should be tightened after the
internal connection is made.
Note:
If required, transition to larger venting within 2' of the cabinet.
CPL00938 – 2" x 3" offset coupling may be used and is factory
supplied with 120 MBTUH furnaces. Canadian applications may
use BAYREDUCE to meet ULC-S636 requirements.
Important:
Trim the pressure switch tubing to length to ensure there
is no sag or trap created.
F
Fu
urrn
na
acce
e C
Co
om
mb
bu
ussttiio
on
n A
Aiirr E
Ex
xh
ha
au
usstt O
Op
pttiio
on
nss
Содержание A951X040BD3SAB
Страница 13: ...88 A951X001 1D EN 13 Outline Drawings Upflow Furnace B Size Cabinet ...
Страница 14: ...14 88 A951X001 1D EN Upflow Furnace C Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 15: ...88 A951X001 1D EN 15 Upflow Furnace D Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 16: ...16 88 A951X001 1D EN Downflow Furnace B Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 17: ...88 A951X001 1D EN 17 Downflow Furnace C Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 18: ...18 88 A951X001 1D EN Downflow Furnace D Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 102: ...102 88 A951X001 1D EN N No ot te es s ...
Страница 103: ...88 A951X001 1D EN 103 N No ot te es s ...