88-A951X001-1D-EN
77
1.
Remove port cap on left of inducer and connect inducer
condensate tubing. Connect other end of inducer condensate
tubing to top port on the condensate trap. Cut tubing to length, if
necessary.
2.
Install previously removed port cap onto bottom port of the
inducer.
3.
Connect condensate pressure switch tubing to pressure port on
the condensate trap.
Important:
Trim the condensate pressure switch tubing to
length to ensure there is no sag or trap created
4.
Connect rain gutter condensate hose to the rain gutter and the
lower port of the condensate trap.
4
1
3
Furnace in Horizontal Left Position - Side
Vented Combustion Air
Changes do not need to be made to the inducer orientation when
installing the upflow furnace in the horizontal left position with the
combustion air vented through the top. Changes are needed for hose
routing, condensate trap orientation, and inducer port caps.
The figure to the right shows the furnace as it is sent from the factory.
Use the following steps to modify the furnace for horizontal left with
top venting of combustion air.
Before proceeding, lay unit on its back to make the conversion easier.
1.
Remove all drain hoses from condensate trap.
Note:
When removing condensate hoses from the condensate trap,
hold the trap with your hand to prevent the trap from breaking.
Removing the trap before the hoses is also an option.
2.
Remove drain tubing from bottom of inducer housing.
3.
Remove rain gutter tubing from inducer outlet.
4.
Remove tubing from condensate pressure switch.
5.
Remove the screws that hold the condensate trap bracket. The
condensate trap should not be removed from the condensate trap
bracket. Remove assembly and retain for later installation.
Note:
There is a plastic adapter with O-rings located inside the cold
header that is held in place by the condensate trap bracket. Do
not lose this adapter. This adapter needs to be in place when
the condensate trap bracket is reattached.
F
Fu
urrn
na
acce
e C
Co
om
mb
bu
ussttiio
on
n A
Aiirr E
Ex
xh
ha
au
usstt O
Op
pttiio
on
nss
Содержание A951X040BD3SAB
Страница 13: ...88 A951X001 1D EN 13 Outline Drawings Upflow Furnace B Size Cabinet ...
Страница 14: ...14 88 A951X001 1D EN Upflow Furnace C Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 15: ...88 A951X001 1D EN 15 Upflow Furnace D Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 16: ...16 88 A951X001 1D EN Downflow Furnace B Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 17: ...88 A951X001 1D EN 17 Downflow Furnace C Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 18: ...18 88 A951X001 1D EN Downflow Furnace D Size Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 102: ...102 88 A951X001 1D EN N No ot te es s ...
Страница 103: ...88 A951X001 1D EN 103 N No ot te es s ...