Copyright ©2018, Infoblox, Inc.All right reserved.
Figure 8 Side Rail Placement
7. With one person on each side, lift the appliance and position it in front of the rack.
8. Align the side rails on each side of the appliance with the mounting rails on the seismic rack.
9. Slide the appliance onto the mounting rails and into the rack. As you slide it into place, the catch mechanisms will click, indicating that
you can safely withdraw the system from the rack without accidentally pulling it free.
10. Snap the appliance into place, and fasten it to the rack using the retainer screws provided in the accessory kit. (For further information,
refer to the instructions shipped with the accessory kit.)
11. Pull down the retention levers on both sides of the appliance, and insert the retainer screws on both sides, as shown in
.
Figure 9
Figure 9 Pulling Down the Retention Levers on Front Panel for Retainer Screw Installation
Ground Lug Installation (DC Systems Only)
Figure 10 Ground Lug Installation Sequence
Содержание Infoblox-4030
Страница 24: ...Copyright 2018 Infoblox Inc All right reserved...