5 | Installation
INFICON
40 / 100
Pernicka-700H-CHLD-Operating-instructions-jin76aen1-04-(1911)
1
1
2
1
1
1
1
Fig. 17: Build and mount the purge gas supply
1 Reinforcing sleeves: Before continuing to assemble, put the reinforcing
sleeves into the intermediate corrugated hose.
2 The O-ring on the reinforcing sleeve seals by screwing.
10
To prevent the test object from being sucked out of the test chamber during the
measurement process, place the delivered grid in the test chamber.
Grid
Test chamber (lid open)
Flange
1
2
3
4
5
6
Fig. 18: Test chamber with inserted grid (left) and flange with example numbering of the screws
(right)
Содержание Pernicka 700H CHLD
Страница 2: ...INFICON GmbH Bonner Strasse 498 50968 Cologne Germany ...
Страница 99: ......
Страница 100: ......