6 | Operation
INFICON
64 / 100
Pernicka-700H-CHLD-Operating-instructions-jin76aen1-04-(1911)
Information
Fig. 34: "Input" window
3
Enter your desired information. Optionally, you can capture the desired
information from the test objects with a bar code reader.
4
To start the measurement process, press the "Proceed" button.
5
Track the measurement process using the progress bar.
6.5.3.3 Perform gross leak test
The gross leak test takes place automatically. The previously set setpoint is used as
the abort criterion for this measurement process (see Set the setpoint for gross leak
55]"). If the helium signal falls below this setpoint, the measurement process is
terminated correctly and the measurement process is continued with the fine leak test
(see "Carry out a fine leak test [
65]").
If the helium signal exceeds this setpoint, the measurement process is terminated and
no fine leak test is performed.
See "Complete the measurement process according to the gross leak and fine leak
66]".
6.5.3.4 Terminate the measurement process after gross leak test
1
Press the "Load/Unload" button in the "Mini" measuring window or in the
"Measure" measurement window".
2
Remove the test object from the test chamber.
ð
The measurement process is finished.
Содержание Pernicka 700H CHLD
Страница 2: ...INFICON GmbH Bonner Strasse 498 50968 Cologne Germany ...
Страница 99: ......
Страница 100: ......