8 - 16
PN
07
4-
51
9-
P1
C
3000 Micro GC Operating Manual
8.2.6 Install a GC Module
Once a module is removed, it can be replaced with another module. If the
replacement module uses a different carrier gas, follow the procedure in
6.4, Change Carrier Gas Configuration, on page 6-9
.
NOTE:
For the Standard GC Module, skip step 1 and proceed to step 2.
1
Set the Performance Enhanced GC module address by setting the DIP switch
on the upper right of the D-board to the appropriate configuration. See
Figure 8-17 DIP switch position on the D-board
Each setting determines a unique module address. Refer to the label on the top
of the module.
DEF
is the default DIP switch setting that is set in the factory.
See
.
Figure 8-18 Module address label on top of a performance enhanced module
Содержание 3000 Micro GC
Страница 1: ...O P E R A T I N G M A N U A L 3000 Micro GC Gas Analyzer PN 074 519 P1C Cover Page ...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 18: ...TOC 10 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 26: ...1 8 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 128: ...6 20 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 268: ...11 20 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...