IO-Link Master with EtherNet/IP Interface StandardLine 4 Ports IP 65 / IP 66 / IP 67
21
8
Set-up
Content
Read device and diagnostic information ................................................................................................22
52476
When the supply voltage has been switched on, the AL1120 starts with the factory settings. The
display elements signal the current operating status (
→
Operating and display elements
(
To enable parameter setting of the AL1120, the fieldbusinterface of the network environment must be
configured correspondingly.
► Configure the fieldbus interface (ports X21 / X22) (→
Fieldbus: Configure IP settings
(
or
→
Integrate the AL1120 into the EtherNet/IP project
(
>
The fieldbus interface has valid IP settings.
>
The user can set the parameters of the AL1120.
Further steps:
Optional: Update the firmware of the AL1120 (
→
Firmware update
(
Set the parameters of the AL1120 (
→
Configuration
(